Removing the concourse is the visible part of a mall redevelopment. This guide covers the decisions behind it: where to cut, what to keep, what goes into the ground, and how the new center is laid out.

Worked in full in The Mall Redevelopment Handbook by Julian R. Sterling, with every case figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

What de-malling means

De-malling is the removal of all or part of the enclosed concourse of a shopping mall and the conversion of what remains into an open-air center whose stores face outward. It ranges from cutting a mall in half to keeping a single anchor box. It reverses four features of the old building: it faced inward, it pooled parking far from the stores, it was one building with one set of systems, and it was very deep.

Decide what stays

For each existing structure, ask three physical questions. Can it stand alone once it is cut free, with its own end wall and utilities? Can its tenants have exterior entrances and signs? Is its floor plate usable by a tenant that exists in the market? The clean places to cut are the expansion joints, where the original engineers already separated the structure.

Then ask the economic question: does the structure earn more standing than the land under it would earn cleared? In the fictional case of The Mall Redevelopment Handbook, the owner of Larkmoor Mall keeps a cinema, a former department store box, and one wing, and demolishes 450,000 square feet. The finished center has 399,600 square feet, of which 54.1 percent is reused structure.

Type of spaceAverage initial rent per sq ftAverage hard cost per sq ft
New buildings$28.82$179.23
Reused structures$13.35$54.12

These are assumptions of a fictional case, not market data. What they show is the ratio. Reused space earns lower rents at a far lower cost, which is why an owner looks hard for structures worth keeping.

Abatement and demolition

Buildings of the 1970s commonly contain asbestos. Federal air regulations (40 CFR Part 61, Subpart M) require an inspection before demolition or renovation, written notice to the regulator at least ten working days before demolition begins, and removal of regulated material before it is disturbed. States add their own rules. The survey comes first, and its findings drive cost and schedule.

Demolition is cheap per square foot and expensive in total. The case budgets $1,250,000 for abatement and $3,825,000 for demolition at $8.50 per square foot. Crushing concrete on site for reuse, salvage, and the amount of selective demolition next to buildings that stay open all move the rate.

Site work is the line that surprises

A mall site looks finished and is not. De-malling needs new grades, a street or drive network that works without the ring road, utilities sized and routed for separate buildings and for parcels to be sold, stormwater management to current rules, and rebuilt parking. The case carries $9,200,000 of site work, against $43,055,000 for the buildings.

The new layout

Before any of this

None of the physical work can start until the owner controls the site. That means amending the reciprocal easement agreement, buying or neutralizing the closed anchor boxes, and clearing the leases in the sections to be demolished. In the case those control costs are $7,200,000, on top of a purchase of $11,220,000.

Whether the result pays is a separate question, covered in mall redevelopment feasibility. The free Mall Redevelopment Feasibility Model (Excel) lets you enter each component as new construction, reuse, or a ground-leased pad, and see what the choice does to cost and yield.

Questions practitioners ask

What is de-malling?

The removal of all or part of the enclosed concourse of a shopping mall and the conversion of the property into an open-air center, usually keeping some existing structures and turning them to face outward.

Is it cheaper to reuse a mall building or to demolish it?

Reuse usually costs far less per square foot than new construction but earns lower rent and carries more unknowns. The decision is made structure by structure, by comparing what each would earn kept with what the land would earn cleared.

What has to happen before a mall can be demolished?

The owner needs control of the site under the reciprocal easement agreement and the leases, an asbestos survey and abatement, required notices to regulators, and separation of utilities for any structures that stay.

Read the full handbook

This guide is drawn from The Mall Redevelopment Handbook, following Larkmoor Mall from the locked door to the sale.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks

Free download: Mall Redevelopment Feasibility Model (Excel).

Illustrative figures computed by the book model; Larkmoor Mall is fictional. Education only, not legal, tax, or investment advice.