An unlocked, macro-free Excel model for sizing ratepayer-backed utility securitization bonds, calculating non-bypassable $/kWh charges, stress-testing load drops and write-offs, and verifying mandatory periodic true-ups.
Model a complete 15-year, 3-tranche utility securitization in minutes: input storm, wildfire, or plant-retirement costs, calculate write-off-adjusted PBR and residential bill share, toggle between Base, Period 1 Shock, and AAA Extreme Stress, and prove present-value ratepayer savings against traditional pre-tax WACC.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Utility_Securitization_True_Up_Model.xlsx (22 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Utility Securitization Bond Handbook, covering enabling statutes, irrevocable Financing Orders, bankruptcy remoteness, sequential tranching, periodic true-ups, AAA stress criteria, ASC 810/980, IRS Rev. Proc. 2005-62 & 2024-15, and SEC Reg AB II.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: how utility securitization works, financing orders and true-up mechanisms, and storm and plant retirement securitization.
Six unlocked tabs: Deal_Inputs with an interactive 3-Scenario Stress Selector (Base, Period 1 Shock, AAA Extreme Stress), a 30-period sequential-pay Amortization Engine, a dynamic True-Up Stress Engine calculating Capital Subaccount draws and adjusted $/kWh rates, a Ratepayer NPV comparator, and a Controls tab reading 0.
No. Every tab is unlocked, macro-free, and separates blue user inputs from black live formulas with Controls = 0.