Free Excel Templates

Student Housing Development Pro Forma (Excel)

An unlocked workbook for a new off-campus student housing project: bed mix and rents, development budget, a monthly engine, the pre-leasing curve, the cost of a late opening, the construction loan, yield on cost and returns.

A student housing development is decided before it opens: by the beds signed before move-in day and by whether the building is ready on that day. This template builds the project month by month from closing, funds it with equity and the loan, prices a late opening and reports the lender's tests, yield on cost and the return, with a Controls tab that reads 0.

Get the Excel model

One unlocked Excel workbook, no macros. Free: enter your email address and the download opens at once.

Student_Housing_Development_Pro_Forma.xlsx (89 KB)

Unsubscribe in one click. How your address is used.

What the example shows

The workbook opens with the fictional case of the book, The Wexley: 600 beds, gross potential rent of $629,160 a month, a budget of $68,882,300 and a construction loan of $41,400,000. With those inputs construction interest is $1,695,354 against an interest reserve of $2,250,000, the untrended yield on cost is 6.88% and the levered IRR 19.0%. Select the slow pre-leasing scenario and the debt yield at the loan's initial maturity falls to 8.5%, below the 9.0% the lender requires to extend. Every one of these figures is invented for illustration.

The handbook behind this model

Built from The Student Housing Development Handbook, which explains every input of the pro forma, from the demand study and the bed mix to the construction loan, the joint venture and the exit, and adds the investor and sponsor waterfall in the full case workbook.

Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook

Related guides: The Cost of a Late Student Housing Delivery on Move-In Day, Student Housing Development Budget: FF&E, Pre-Opening, Parking and Bed-Bath Parity, Yield on Cost for Student Housing Development.

Questions practitioners ask

What does the Student Housing Development Pro Forma include?

Twelve unlocked tabs: Inputs, Program (beds, bathrooms, area and rent by unit type), Demand (renter pool and competitive set), Budget (sources and uses), Monthly (construction, funding, interest, operations and the sale month by month), Pre-Leasing, Late Delivery, Operations, Loan, Returns, Scenarios and Controls.

Can I use it for my own project?

Yes. It opens with the inputs of the book's fictional case as an example. Overwrite the blue cells with your own bed mix, costs, loan terms, schedule, occupancy and rents. The construction period can run from 12 to 36 months.

Does it tell me whether my campus can absorb the building?

No. It shows what your assumptions imply for the reserves, the loan tests, the yield and the return. The assumptions themselves (rents, first-year occupancy, the pre-leasing curve) have to come from a demand study of your campus.