An unlocked, 30-year stadium and arena public-private financing workbook covering construction costs, special tax and PILOT bonds, team contributions, PSLs, naming rights, premium seating, ticket surcharges, debt service coverage, reserves, and attendance/tax stress testing.
Underwriting a modern sports stadium or arena requires simultaneous mastery of IRC Section 141 tax-exempt limits, IRC Section 148(d) DSRF caps, Contractually Obligated Income (COI), and downside recession stress tests. This standalone template runs the full 30-year stack dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Stadium_Arena_Financing_Model.xlsx (24 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Stadium and Arena Financing Handbook, covering tax-backed and PILOT bonds, IRC Section 141, team equity and PSLs, naming rights, luxury suites, non-relocation agreements, and downside credit math.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: how stadium financing works, stadium bonds and PILOT structures, and naming rights and premium seating revenue.
Six unlocked tabs: README, Assumptions with a live 3-scenario selector (Base, Downside, Upside), Capital_Stack_Const (Sources & Uses, MADS, IRC Section 141 private payment check, IRC Section 148(d) three-prong DSRF), Operating_Debt_30Yr (30-year multi-tranche DSCR and Team IRR), Stress_Matrix, and Controls.
No. Every tab is unlocked, macro-free, separates blue inputs from black live formulas, computes interest on beginning debt balances, and verifies Controls = 0.