An unlocked institutional workbook for clean electricity projects: 2026 IRS rates, additive 1.20x bonuses, Section 45Y vs. Section 48E NPV net of IRC 50(c) and 100% bonus MACRS, OBBBA MACR cliff alert, and Section 6418 / 6417 monetization.
Before locking a Section 45Y vs. Section 48E election or signing a turbine supply contract, verify your exact 10-year credit PV, breakeven capacity factor, OBBBA 40 percent MACR compliance buffer, and Section 6418 transfer proceeds. This standalone Excel model runs every calculation dynamically with Controls = 0.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
Section_45Y_Credit_and_Monetization_Calculator.xlsx (18 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Section 45Y Handbook, covering zero-emissions eligibility, 80/20 repowerings, PWA cures, Energy Communities, Notice 2025-08 Domestic Content, OBBBA PFE MACR rules, Direct Pay, Section 6418 transfers, and Form 7211 audit defense.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: Section 45Y credit rates and 45Y vs. 48E math, PWA penalties, Domestic Content, and OBBBA PFE rules, and Section 6418 transferability and Direct Pay.
Six unlocked tabs: README, Project_Inputs (3-scenario selector), 45Y_vs_48E_Engine (10-year 0.1-cent rounded PTC schedule, 48E net of IRC 50(c), breakeven CF, automatic verdict), Compliance_and_Monetization (OBBBA MACR PASS/FAIL cliff, bond haircut, 6418/6417 proceeds), Sensitivity_Table, and Controls = 0.
No. Every tab is unlocked, macro-free, separates blue user inputs from black formulas, and verifies Controls = 0.