An unlocked 6-tab Excel workbook to model facility Scope 2 dual reporting, Residual Mix penalties, Pathway A/B/C procurement budgets, after-tax REC arbitrage, and audit-ready retirement ledgers.
Most corporate REC spreadsheets fail external assurance because unmatched load uses grid averages instead of Residual Mix factors, arbitrage ignores IRC Section 61 tax drag, or retirement logs omit serial ranges. This unlocked workbook separates blue inputs from black live formulas with automated Controls = 0 checks.
One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.
REC_Procurement_and_Scope2_Calculator.xlsx (16 KB)
Unsubscribe in one click. How your address is used.
Built directly from The Renewable Energy Certificate Handbook, covering state RPS ACP ceilings, Green-e 21-month windows, EU RED III GOs, FASB ASU 2026-02 (ASC Topic 818), IRC Section 45V Three Pillars, and project finance DSCR haircuts.
Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook
Related guides: how RECs work, REC accounting under ASC 818, and Scope 2 Market-Based REC math.