Free Excel Templates

Municipal Five-Year Forecast Model (Excel)

An unlocked workbook that projects a city or county general fund five years ahead by revenue source and expenditure type, tests structural balance, and compares the unassigned reserve with your policy floor, target, and ceiling.

A single balanced budget year says little about the years that follow. This template shows the operating result, the structural result without one-time items, and the reserve against your policy in every year, with a recession switch, and checks itself with a Controls tab that must read zero.

Get the Excel model

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once.

Municipal_Five_Year_Forecast_Model.xlsx (21 KB)

Unsubscribe in one click. How your address is used.

The handbook behind this model

Built directly from The Local Government Budget Handbook, covering the budget calendar, revenue and cost forecasting, the five-year forecast, structural balance, closing a gap, reserve policy, scenarios, budgetary control, and communication with councils and rating analysts.

Paperback, $32.99 PDF edition, $19.99 Book page and full case workbook

Related guides: structural balance in a local government budget, municipal revenue forecasting methods, and how to set a general fund reserve policy.

Questions practitioners ask

What does the Municipal Five-Year Forecast Model include?

Four tabs after the README: Inputs for your base-year actuals, growth rates by line and year, one-time items, fund balance and reserve policy, and recession shocks; Forecast with revenues, expenditures, the operating result, structural balance, and the fund balance roll-forward; Reserves with the unassigned balance against your floor, target, and ceiling; and Controls.

How do the controls work?

They check that each total equals the sum of its lines, that the final fund balance equals the opening balance plus the cumulative results, and that structural balance plus one-time items equals the operating result. The total must read 0.

Does it reproduce the book's case forecast?

Its base year ties to the fictional City of Halston Ridge for fiscal year 2026. The forecast years use simple illustrative growth rates; the book's case forecast is built from positions and policy measures in the full case workbook on the book page.