Free Excel Templates

Cloud Commitment Calculator (Excel)

An unlocked Excel calculator that sizes a cloud commitment on a week of your own hourly usage: the best level for each discount option, its utilization, coverage, effective savings rate and break-even, with a ladder and a downside test.

A commitment discount pays only in the hours it is used, so the right size comes from hourly data, not from a monthly bill. This calculator takes 168 hourly values of On-Demand-equivalent spend on commitment-eligible compute and up to four discount options, tests all 501 commitment levels from zero to your peak, and shows which level saves the most, how far below it the floor sits, and what happens if usage comes in lower than planned.

Get the Excel calculator

One unlocked Excel workbook, zero macros. Free: enter your email address and the download opens at once, along with the other free models.

Cloud_Commitment_Calculator.xlsx (128 KB)

You join the reader list: one email when a new free model or book comes out. Unsubscribe in one click. Already subscribed? Enter the same address. How your address is used.

The handbook behind this calculator

This calculator is the reusable core of the 14-tab workbook in The Cloud Cost Management Handbook, which takes one SaaS company from a $17,460,000 bill that nobody owned to a 2026 budget below the prior year: billing data and FOCUS, tagging, shared cost allocation, unit economics, usage optimization, Reserved Instances, Savings Plans and committed use discounts, a commitment ladder that saves $1,672,188.53 a year, forecasting, anomalies and executive reporting.

Paperback PDF edition, $19.99 Book page and full workbook

What is inside the workbook

README
What the file does, the conventions and the steps in order: paste the week, set the options, keep or change the grid step, test a ladder and a downside case, clear the checks.
Inputs
Blue cells: up to four options, each with a label and a discount, the grid step in dollars per hour (with a suggested step if your peak hour is large), the ladder test (option and commitment of the base layer, with a suggested base at 60 percent of the lowest hour, and the option of the second layer) and the downside test (how far below the week usage could run).
Week
168 hourly values of On-Demand-equivalent spend on commitment-eligible compute, Monday 00:00 to Sunday 23:00. Paste a representative week of the coming term, after the optimization you have committed to.
Grid
Every commitment level from zero to your peak hour, up to 501 levels, and for each option the usage above the cover, utilization, coverage, effective savings rate, annual saving and unused commitment per year.
Results
The week total, lowest, average and highest hour; for each option the best commitment, its utilization, coverage, ESR, annual saving, unused commitment and break-even utilization (1 minus the discount), and the floor level sized on your lowest hour; then the ladder and the downside case, layer by layer.
Checks
7 internal tests, from the count of hourly values and negative values to discounts outside 0 to 99 percent, a grid that does not reach the peak and ladder totals that do not tie, plus 65 reconciliation lines to an independent computation of the prefilled example, switched off once you enter your own data. The total counts the exceptions and must read zero.

The prefilled example

The file opens with Example Co., an illustrative profile whose every hourly value is invented: a daily swing with an afternoon peak, a nightly dip and lower weekends. It carries four illustrative options, a 1-year and a 3-year term each with no upfront and all upfront payment, at 24, 29, 41 and 47 percent. These are not any provider's prices. The ladder test puts option 3 under option 1, and the downside test assumes usage 15 percent below the week. Paste your own week, replace the discounts with your quote, set the reconciliation switch on Checks to 0, and read the results.

How to use it before a purchase

  1. Export a recent week of hourly spend on commitment-eligible compute from your billing data, priced at On-Demand-equivalent rates, and leave out GPU, licensed and specialty instances that no program covers.
  2. Adjust it for the rightsizing, scheduling and Spot moves you have committed to: size on the usage that will exist, not on today's waste.
  3. Enter the discounts you are actually offered, as of the date of your quote, for each term and payment option.
  4. Compare the best level with the floor and read the downside case before the base case; when unsure, err low, because overshooting costs far more than undershooting.
  5. Clear the Checks tab, then put the level, the break-even utilization and the downside result in your purchase memo.

For the method behind each step, read how to size a commitment and read its break-even utilization; for who carries the savings, how to allocate shared cloud costs; for what commitments do to cost per customer, how to calculate cloud unit economics.

The calculator does not read provider prices, apply instance-level matching, Reserved Instance attributes or a provider's application order, or model usage growth across a term. A working aid, not a purchasing system. Education only, not accounting, tax or legal advice.

Questions practitioners ask

What does the cloud commitment calculator compute?

From a week of your hourly On-Demand-equivalent compute spend and up to four discount options, it tests every commitment level from zero to your peak hour and returns, for each option, the best level, utilization, coverage, effective savings rate, annual saving, unused commitment and break-even utilization, plus the floor level, a two-layer ladder and a downside case.

Does it include real provider discounts?

No. It ships with illustrative discounts that are not any provider's prices. Replace them with the rates on your quote or on your provider's current page before deciding.

Why does it use hourly data instead of monthly spend?

Commitments are consumed hour by hour, and an hour of commitment that finds no eligible usage is lost. A monthly average hides the troughs that create waste and the peaks a commitment cannot cover profitably.

Does it work for Savings Plans, Reserved Instances and committed use discounts?

It works for any commitment stated in dollars per hour of discounted spend, such as Savings Plans, the Azure savings plan for compute or flexible committed use discounts. For a resource-based commitment, express it as the hourly spend it represents and treat the result as an approximation.