Structuring, Pricing, Sizing, and Managing TANs, RANs, BANs, TRANs, and Municipal Commercial Paper
By Julian R. Sterling | 43,637 words | 140 pages (A5 PDF & Paperback)
Master the quantitative structuring, pricing, sizing, and compliance of U.S. municipal short-term notes (TANs, RANs, BANs, TRANs, Tax-Exempt Commercial Paper, and VRDNs). Anchored in a fully reconciled multi-program case study (City of Alderbrook $30,000,000 TRAN, $45,000,000 BAN and TECP/VRDN alternatives, plus Village of Millbrook $8,000,000 Bank-Qualified note), this handbook covers Proceeds-Spent-Last accounting, the 5% working capital reserve, MSRB Rule G-33 day-count math, NIC vs. TIC competitive bidding, IRC Section 148 arbitrage safe harbors, MIG 1 / SP-1+ ratings, SEC Rule 15c2-12 exemptions, GASB 38 and 88 disclosures, and Rule 2a-7 / Basel III LCR buyer constraints. The models are not described, they are supplied: unlocked formula-driven Excel workbooks reproduce every figure in the book.
Every calculation for the City of Alderbrook ($30,000,000 TRAN, $45,000,000 BAN, TECP/VRDN) and Village of Millbrook ($8,000,000 Bank-Qualified note) is reproduced by live, unlocked Excel formulas.
Download All Companion Files (ZIP) Download 9-Tab Master Model (.xlsx)
Want the streamlined 4-tab TRAN sizing and Rule G-33 pricing starter workbook? Get the free Municipal Note Sizing & Pricing Starter Model.
| Program / Metric | Statutory / Market Basis | Model Output |
|---|---|---|
| Alderbrook TRAN Max Sizing Cap | Treas. Reg. 1.148-6(d)(3)(iii) (5% Res.) | $38,500,000 (Par: $30,000,000) |
| Winning Bid A Pricing (5.00% Cpn) | MSRB Rule G-33 / TIC Award | 3.403% TIC (3.829% All-In) |
| 6-Month 90% Safe Harbor Test | IRC Section 148(f)(4)(B)(iii) | 96.70% (PASS, +$2,042,620) |
| Alderbrook BAN vs. TECP (Net 1-Yr) | $45,000,000 @ 60% Draw / 4.05% Reinv. | BAN $1,093,300 vs. TECP $1,119,600 |
| Millbrook Bank-Qualified Savings | IRC 265(b)(3) & 291(e)(1)(B) | 4.307% vs. 4.946% (63.8 bps) |