Companion files · The Private Markets Career Guides
Large-Load Interconnection, Utility Tariffs, On-Site Generation and Power Contracts for AI and Hyperscale Campuses.
These are the companion files of the book. One workbook rebuilds the Sable Ridge campus, the fictional 300 MW campus that Larkfield Digital Infrastructure plans in three phases of 100 MW: the megawatt ladder from critical IT to contract capacity, the delivered cost per MWh, the large-load tariff with its minimum bill, exit fee and security, the three paths to power (wait for the grid, bridge with gas engines, co-locate with the neighboring plant), the comparison the investment committee sees, and the virtual power purchase agreement. A toolkit holds the checklists of Appendix B in an editable form.
The archive holds the workbook, the toolkit and 00_START_HERE.md. No macros, no circular references, no external links. The workbook recalculates in Excel, LibreOffice or Google Sheets.
Chapters 2, 5, 6, 8 to 10, 12, 13 and 15, and Appendix A
An Inputs sheet holds the case-wide assumptions and each topic sheet opens with its own input block: Load, Delivered cost, Tariff, Path A, Path B, Path C, Compare, VPPA. A Checks sheet puts the figures printed in the book beside the cells that compute them, and the 18 exercises of Appendix A run on it.
Download the workbook35 KBAppendix B
The load letter, reading a facilities study, reading a large-load tariff, the ESA term sheet, the lease power clauses, bridge power go or no-go, co-location approvals and the committee paper on power.
Download the toolkit40 KBRead first
What each file holds, which sheet answers which chapter, and the two inputs to change first.
Download the read-me2 KB| Delivered cost | Energy $48.00, capacity $15.63, transmission $10.27, distribution $4.28 and riders $3.00: $81.18 per MWh at a load factor of 0.80 |
| Minimum bill | A slow ramp at 40 percent of contract costs $1.42 million a month for demand the tenant does not use, $17.0 million over a year |
| Three paths | Cost to the project budget: A $72.0 million, C $136.0 million, B $357.0 million. Total economics: C $301.2 million, B $435.0 million, A $478.4 million |
The files are provided as they are, without warranty of any kind. The model is illustrative: Larkfield Digital Infrastructure, the Sable Ridge campus, the Corran Mill plant, the tenant, the utility and the regional market are fictional, and rates, prices, costs and dates are the book’s assumptions, not the tariff of any real utility, the price of any real market or a forecast. Nothing here is legal, regulatory, engineering or investment advice.
Learn to develop and finance a data center campus, step by step: the Data Center Development & Finance course →