Companion files · The Data Center Operations Handbook
Running, Leasing and Scaling Colocation and Hyperscale Facilities: Uptime, Power, Cooling, Contracts and the Economics of a Live Data Center.
The DRM-free PDF edition, $19.99 → Read the first chapter freeBuying for your firm? Add your company name and VAT number at checkout and they go on the invoice. For a team: team license, up to 10 people, $59.99 · firm-wide license, $139.99.
These are the companion files of the book. One workbook rebuilds Varden Point, the fictional 36 MW campus the book follows from the day its builder leaves: a retail colocation building, a wholesale building in suites and a building leased to a hyperscale tenant, month by month for three years. It computes capacity, PUE, rent, energy billed and bought, the operating budget, the loan and every figure the book prints. A second file holds the operating checklists and templates of Appendix B in editable form. Around them: a blank copy of the workbook for your own site, eight documents to print, forty questions and three cases the book names but does not work. No sign-up, no email is asked for, nothing is locked. Amounts are in US dollars; blue type is an input, black type is a formula.
The archive holds the workbook, the checklists, the blank model set, eight working documents, forty questions and three new worked cases, with 00_START_HERE.md at its root. Each group below can also be downloaded on its own. Last revised 16 November 2026. No macros, no circular references, no external links. The workbook recalculates in Excel, LibreOffice or Google Sheets.
Reading the paperback or the Kindle edition? The same book is also sold as a DRM-free PDF: searchable, printable, yours on any device. $19.99, instant download.Buy the PDF edition → Free sample
Finished the book? Two or more PDF editions bought together are 15% off. Browse the PDF editions →
The working models behind the books, built out for live deals: the Pro models →
Learn to develop and finance a data center campus, step by step: the Data Center Development & Finance course →
Optional. When the workbook on this page is corrected or a new worked case goes up, readers on the list get one email, plus a short note when a new book comes out. The downloads do not need it.
Join the reader listRun by MailerLite, off this site. How your address is used.
Chapters 1 to 16 · Appendix A
One Inputs sheet holds every assumption. Monthly rebuilds 36 months: sold and drawn capacity, PUE by building, rent, cross-connects, services, energy billed under three structures and bought from the utility, the energy margin, churn and commissions. Annual gives the three-year budget, per-megawatt measures, water, emissions, the loan and its DSCR. Then the cooling levers, the staffing models, the generator, circuit and incident arithmetic, the maintenance program, the UPS block mapping, the price floor, the hyperscale ramp and the retrofit, and a Checks sheet that sets 86 figures the book prints beside the cells that compute them. Revised 16 November 2026: the year-1 maintenance contracts and the half-suite loads of Building B, written inside formulas, are now inputs; no figure changes.
Download the workbook47 KBAppendix B
The first ninety days after handover, the method of procedure template, the incident report template, the monthly pack front page, opening a hall, and the lender appendix. Edit them for your own site.
Download the checklists39 KBRead first
What the files are, which tab answers which chapter, and the two inputs to change first.
Download the read-me3 KBFor your own site · Appendix A
The same workbook with its 165 inputs emptied: capacity and lease-up, prices, energy terms and the PUE curve, operating costs, generators, the loan, emissions, the retrofit and the incident on Inputs, and the organization, the maintenance program and the UPS block loads on their own sheets. The two switches, the draw levels and the PUE levels stay. Until every input is filled, every formula shows nothing and Inputs counts what is missing; 18 identities check the result. The book’s inputs are listed cell by cell in book_inputs.txt, and refilled from it the blank set reproduces the full workbook cell for cell.
Download the blank set40 KBChapters 2 to 15 · The three cases
Six parts: uptime, power and incidents; cooling and PUE; contracts and capacity; the budget and the loan; staffing and maintenance; and the three new cases. Numbers and multiple choice, marked as you type; a score sheet tells you which part to revise; the marking sheet gives every answer and its reason.
Download the questions14 KBEight pages to print and use. A4, with margins wide enough for US Letter.
Chapters 1, 4, 5, 7, 10, 14 and 15 · Appendix B
The first ninety days after handover, each line closed with evidence; the method of procedure, with its field walk-down, one action per step and hold points; the incident report with the credit worksheet and both availability measures; the generator test and fuel log with the fuel arithmetic; the capacity record and the UPS block map, checked before every quote; opening a hall, with the hall breakeven; the monthly pack front page with the month-30 figures as the example; and the lender appendix, from the covenant to the distance to each threshold.
Download the PDF23 KBNew material, not a restatement. Each case takes a situation the book names and does not compute. Each is the companion workbook with three sheets in front: the note, the case beside the book, and checks that end ALL OK. Values the book does not give are inputs, marked ADDED.
Chapters 10 and 14 · Case one
Chapter 10 leaves 300 kW of Building B unsellable and calls the remedy slow. They forgo $515,597 of rent a year and still carry $399,300 at the price floor. Moving 240 kW of contracted load onto block B2 frees a standard suite; done now, the remap is worth up to $3.72 million over ten years, about $0.2 million less for every year it waits.
Chapters 1 and 15 · Case two
“Every month that a sold kilowatt is delayed in reaching billing is paid for by the reserve.” One month costs $0.87 million, three months $2.37 million, and the year-2 DSCR reaches lock-up after a slip of 4.54 months. Beyond 3.73 months the year-1 shortfall is no longer enough; borrowed under the loan, the reserve is $7.78 million, not $7.28 million.
Chapter 1 · Appendix A · Case three
Appendix A warns that a ratchet can make a commissioning test expensive. With the integrated systems test on the owner’s campus meter and an 80 percent ratchet, the bill carries 296,169 kW-months above the load: $2.96 million at $10 per kW-month, more than the year-1 energy margin of Buildings A and B from $0.86. Opening hall A4 in month 33 does not trigger it.
Download the three cases144 KB| The empty halls | Conditioning all four retail halls from day one would have taken the month-1 PUE of Building A from 1.45 to 2.09 and cost $0.35 million of energy margin in year 1 |
| The last suite | Building B has 1,500 kW unsold on paper, but no pair of UPS blocks can take a standard suite: it sells as 1,200 kW, and 300 kW stay stranded |
| The loan | The DSCR moves from 0.62x in year 1, carried by an interest reserve, to 1.56x in year 3, when recurring revenue could fall 15.7 percent before lock-up |
The files are provided as they are, without warranty of any kind. The model is illustrative: Varden Point, its owner, operator, customers, tenant and lender are fictional, and the figures are the book's assumptions, not market statistics. Nothing here is engineering, legal, tax, accounting or investment advice.
Forty private markets interview questions with model answers and the arithmetic worked out. Direct download, no sign-up.
Get the cheat sheetDiscover more of Julian R. Sterling's practical library of models, checklists and worked cases.
Browse Julian R. Sterling's books Browse all companion files| 16 Nov 2026 | Revised the workbook: the year-1 maintenance contracts ($1.749 million) and the half-suite loads of Building B, written inside formulas, are now inputs; every figure is unchanged. Added eight working documents to print, the blank model set with the book’s inputs, forty self-marking questions and three new worked cases (the stranded kilowatts, a slower lease-up and the interest reserve, the commissioning test and a demand ratchet). |
| 8 Oct 2026 | Companion files published with the book. |
More in infrastructure and energy, with free companion files. The full list of titles is on the author page.