Appendix A: The Forty-Question Reading Checklist
Use these forty questions with any Corps authorization, whether it is a nationwide permit verification or an individual permit. Each question ends with the chapter that explains the answer. Work through the groups in order the first time; later, jump to the group that matches the decision in front of you.
The permit family and the file
- Which authorization is in the file: a section 404 permit, a section 10 permit or both, and is it an individual permit, a nationwide permit verification or another kind of general permit? (Chapter 1)
- Who signed the document, and does the signature block belong to the district engineer of the district that holds the project? (Chapter 1)
- Does the file list the state and local approvals the project also needs, remembering that a Corps permit sits beside them and does not replace them? (Chapter 1)
- Is the file complete: application, drawings, jurisdiction document, public notice or verification letter, permit form, certifications and correspondence? (Chapter 12)
Jurisdiction
- Does the file contain a jurisdictional determination, and is it an approved one or a preliminary one? A preliminary one is advisory and cannot be appealed. (Chapter 2)
- If the determination is approved, does it say which waters are covered, and does its basis summarize the field indicators the district relied on? (Chapter 2)
- For each wetland treated as covered, does the file show how the wetland meets the current connection test described in Chapter 2? (Chapter 2)
- Do the limits of wetlands and streams on the jurisdiction document match the limits drawn on the permit drawings? (Chapters 2 and 7)
Nationwide permits and verifications
- Does the verification letter name the nationwide permit it relies on, and is that permit still in effect for the period of the work? (Chapters 3 and 4)
- Which general conditions and which regional conditions apply to this activity, and were they read along with the special conditions, not skipped? (Chapter 3)
- Was a pre-construction notification required for this activity, and does the file show that it was sent and answered by the district? (Chapter 4)
- Were the losses of the whole single and complete project added up before any limit of the nationwide permit was tested? (Chapter 3)
Individual permits and the decision
- Was the permit decided after a public notice, or issued in letter form after an abbreviated procedure? (Chapter 5)
- Does the decision document show a public interest review, with the benefits of the project weighed against its detriments? (Chapter 5)
- Which agencies and members of the public commented, and does the decision answer each concern that later became a condition? (Chapter 5)
- Does the description of the authorized work in the permit match the project the applicant actually described and drew? (Chapters 5 and 7)
Alternatives
- Does the file hold an alternatives analysis that compares practicable alternatives, rather than a list of options with no comparison? (Chapter 6)
- Does the file say whether the project is water dependent and, if it is not, why an alternative outside the aquatic site was not practicable? (Chapter 6)
- Does the file show how the footprint in waters was avoided or reduced before any mitigation was offered? (Chapter 6)
The permit form and special conditions
- Which general conditions are printed on the permit form, and which of them matter most for this project and this site? (Chapter 7)
- Is each special condition numbered, and does it say who must act, what is required and by what point in the work? (Chapter 7)
- Does each special condition tie to a drawing, a date or a trigger that a contractor can follow without guessing? (Chapter 7)
- Does the permit say how long it lasts, and what must be done if the schedule runs past that point? (Chapter 10)
Mitigation lines
- Does the permit require compensatory mitigation, and in what form: credits from a mitigation bank, credits from an in-lieu fee program or another form? (Chapter 7)
- Are the credit quantities stated separately for wetlands and for streams, and do they follow from the stated ratios and the impact figures? (Chapter 7)
- What proof of purchase or performance must reach the district, and before which stage of the work must it arrive? (Chapter 7)
- Does the permit require a recorded restriction or other long-term protection, and is the recorded document in the file? (Chapters 7 and 12)
Site conditions
- Do the limits of disturbance on the drawings match the fencing and silt fence on the ground, and who inspects them and when? (Chapter 8)
- Do the conditions on fill, culverts and work windows agree with the contractor's schedule, equipment plan and material sources? (Chapter 8)
- Which records must be kept, and can the site superintendent put a hand on the permit and its drawings on the job site? (Chapter 8)
Other approvals
- Is the state's section 401 certification in the file, and does the permit make its conditions conditions of the permit? (Chapter 9)
- Does the permit carry conditions from consultation under the Endangered Species Act or review under the National Historic Preservation Act, such as a clearing window or a discovery condition? (Chapter 9)
- Where the Coastal Zone Management Act applies, does the file show the state's coastal consistency decision? (Chapter 9)
Changes, transfers and appeals
- If the project changed after the permit issued, is there a written modification, and does it match what is being built? (Chapter 10)
- Is the permit's term long enough for the construction schedule, and if an extension is needed, where is the request and the district's answer? (Chapter 10)
- If the property was sold, was the permit transferred by the buyer's signature on the transfer block and sent to the district? (Chapter 10)
- Was any appeal filed against a jurisdictional determination, a denial or a declined permit, and did the request meet its deadline? (Chapters 2 and 10)
Enforcement and transactions
- Does the file hold any letter from the district about unauthorized work or noncompliance, such as a cease-and-desist letter, and is there a closing letter? (Chapter 11)
- Was any work done before it was authorized, and if so is there an after-the-fact permit application or permit in the file? (Chapter 11)
- For a buyer or lender: do the covenant, the credit purchase record, the compliance certification and the transfer record all appear in the closing file? (Chapter 12)