This page is free and needs no sign-up. It reproduces material from The Foreign-Trade Zone Handbook by Julian R. Sterling so you can print it or keep it open while you work.
To print it, use your browser's print button. Figures are as stated in the book; check the official source before relying on any of them.
Check-list for a usage-driven site or a subzone
- Confirm with the grantee which route fits the plant: a request to add a usage-driven site within the service area, or a subzone application. The grantee, not the operator, files the request.
- Describe the site in plain terms: address, owner, any lease, the buildings to be used, the area, and the access that a CBP officer will need. Attach a map and a floor plan.
- Name the operator and the agreement with the grantee that lets the operator work in the zone. Keep the signed agreement in the file.
- State the activity: storage only, or processing, or production. If production is planned, say so now and prepare the notification or application described below.
- Check the activation limit with the grantee. A site can be approved and still be unusable if the area in activated status would exceed the limit.
- List the company contacts: the plant controller, the zone inventory analyst, the customs broker, the zone consultant and the grantee's zone manager.
- Ask the grantee to confirm that the packet is complete before it goes. For a subzone application, the Board staff tell the applicant within a set time of receipt whether the copy is sufficient before it is docketed (section 400.31(b): within 30 days).