Free companion page

Companion page: The Carbon Capture and Storage Handbook

Free to print: Tool 1: Class VI Application Checklist, from The Carbon Capture and Storage Handbook.

This page is free and needs no sign-up. It reproduces material from The Carbon Capture and Storage Handbook by Julian R. Sterling so you can print it or keep it open while you work.

To print it, use your browser's print button. Figures are as stated in the book; check the official source before relying on any of them.

Tool 1: Class VI Application Checklist

Purpose. A Class VI permit application is a large package, and gaps found late cost months. The checklist lists the general items a team confirms with outside counsel and the reservoir engineer before filing and again after each round of technical comments. It carries no regulatory numbers; the content of the application and the review steps are in Chapter 7, and the geology behind the items is in Chapter 5.

How to use it. Give every row one owner and one status. Review the list at the weekly permit meeting. When the state regulator sends comments, add a row for each comment, so the checklist becomes the record of what was asked and what was answered. At the hub, the first round of technical comments arrived in May 2025 on two topics, the area of review model and one legacy well, so those two rows were reopened.

Item Owner Status
Project description: sources, pipeline, number of wells Head of commercial development Open / done
Geologic data: injection zone, confining zone, faults Reservoir engineer Open / done
Area of review model and its inputs Reservoir engineer Open / done
Inventory of legacy wells inside the area of review Project analyst with the engineer Open / done
Corrective action plan for any legacy well that needs it Reservoir engineer Open / done
Well construction and operating plan Reservoir engineer Open / done
Testing and monitoring plan (Class VI rules, Chapter 8; the MRV plan for EPA reporting is a separate document) Reservoir engineer Open / done
Post-injection site care plan Reservoir engineer Open / done
Financial responsibility demonstration (Chapter 13) Outside counsel with the lender group Open / done
Pore space rights evidence for the whole footprint (Chapter 6) Project analyst Open / done
Response log for each regulator comment Project analyst Open / done
Public notice and comment tracking Outside counsel Open / done

Two habits keep the checklist honest. First, never mark a row done on a verbal assurance: attach the document or the date of the filing. Second, keep a column for the date of the last change, because a status that has not moved in a month is a warning in itself.