Free companion page

Companion page: The C-PACE Financing Handbook

Free to print: Tool 4: Measure eligibility check-list, from The C-PACE Financing Handbook.

This page is free and needs no sign-up. It reproduces material from The C-PACE Financing Handbook by Julian R. Sterling so you can print it or keep it open while you work.

To print it, use your browser's print button. Figures are as stated in the book; check the official source before relying on any of them.

Tool 4: Measure eligibility check-list

Run these questions on every measure, one row per measure, before the cost is counted in the financed amount.

  1. Is the measure in an eligible category under this program (energy efficiency, water, renewable, or another category the guide lists)?
  2. Is it permanently affixed to the property, or otherwise within what the program allows?
  3. Does the energy engineer's report document the baseline use, the projected savings and the useful life?
  4. Is the cost supported by invoices, contracts or, for a retroactive deal, completed-work evidence within the program's look-back period?
  5. Does the measure sit inside the project scope that the program administrator approved?
  6. Does the cost include only the measure, not general building improvements that happen to sit nearby?
  7. Does the measure's useful life support the term requested?
  8. Would the owner's counsel and the program administrator reach the same view?

Worked example: the lobby. The office project included a lobby and amenity floor renovation costing $1,200,000. On 6 April 2026 the lobby was found ineligible, because it is not an energy, water or resilience measure in the program's terms, and it left the project. The project was cut back to the six eligible measures.

Item Cost Result
Six eligible measures $10,050,000 Financed
Lobby and amenity floor renovation $1,200,000 Removed
Closing costs and program fees $250,000 Capitalized

The amount financed was $10,300,000. Whether a given measure qualifies always depends on the program guide and the administrator's reading; the case result is not a rule for other programs. Chapter 5 covers the savings test.