Companion page: The Building Performance Standards Handbook

Free to print: Tool 2: Annual report check-list, from The Building Performance Standards Handbook.

This page is free and needs no sign-up. It reproduces material from The Building Performance Standards Handbook by Julian R. Sterling so you can print it or keep it open while you work.

To print it, use your browser's print button. Figures are as stated in the book; check the official source before relying on any of them.

Tool 2: Annual report check-list

Run this check-list every year for each New York building, well before the filing date. Each item has an owner and a piece of evidence to keep. The case's check-list is built from the Local Law 97 report of the three New York buildings; the same discipline works for Boston, with the dates of Tool 1.

  1. Whole-building energy data for the calendar year, tenant data included. Evidence: the data file from the energy consultant, with the list of tenant data requests and the answers received.
  2. Meters and accounts matched to the building. Evidence: a list of every meter and account number, the building it serves and the utility bill for each.
  3. Gross floor area by occupancy group, checked against the Department of Finance records. Evidence: the area schedule with the source of each line. For a mixed-use building such as Corbel Exchange, the split is B 60,000 square feet, M 20,000 square feet and R-2 70,000 square feet.
  4. Emissions calculated with the coefficients of the period. Evidence: the calculation sheet, with the coefficient used for each fuel and the period it belongs to.
  5. Deductions claimed, certificates and offsets, with evidence. Evidence: the retirement record of the certificates, the year they belong to and the location of the source; or the offset receipt. In the case, Meridian Hall had 135 MWh retired on its behalf for calendar 2024.
  6. Certification by the registered design professional. Evidence: the signed certification and the engagement contract, with its date.
  7. Filing before 1 May, or an extension applied for in its window. Evidence: the extension application and its decision, if any.
  8. Filing receipt archived. Evidence: the receipt from the Department's portal, saved to the building file with the report.

Two additions that experienced teams make. First, a sign-off line for the head of asset management, so that the filing is a decision and not an accident. Second, a lessons log: after each filing, one paragraph on what was late, what was wrong and what the next cycle changes.