Municipal reuse ($10,501,349/yr, 1.34x PFAS DSCR) and private Mesa Verde BOO (1.74x base / 1.15x floor, 21.1 percent IRR).
Industrial water reuse turns municipal effluent into a $10.5 million/year take-or-pay revenue engine while PFAS biosolids restrictions threaten to add $3.6 million/year to O&M. Here is the complete underwriting math for municipal reuse, Title XVI grants, and private BOO industrial Water-as-a-Service.
Worked in full in The Wastewater Treatment Project Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
As modeled in The Wastewater Treatment Project Finance Handbook, adding a 10.0 MGD MF/RO/UV-AOP purification train ($54,000,000 capex, offset by a $12,000,000 USBR Title XVI WaterSMART grant) anchored by a 7.5 MGD take-or-pay cooling water contract (8,401 AF/yr at $1,250/AF, or $3.84/kgal) generates $10,501,349 per year for Cedar Creek. That recurring industrial cash flow helps buffer the utility against EPA's 2025 to 2026 PFAS biosolids risk assessment shock (+$120/dry ton across 30,000 dry tons = +$3,600,000/yr O&M), which pushes Stack A Core DSCR below 1.25x (1.14x) while Stack B holds strong at 1.34x.
For standalone private industrial Build-Own-Operate (BOO) water-as-a-service facilities serving hyperscale data centers and semiconductor fabs, lenders size non-recourse debt off CFADS after Major Maintenance Reserve Account (MRA) deposits and test the 80.0 percent Take-or-Pay volume floor:
| Mesa Verde BOO Metric (6.0 MGD / $66,000,000) | Base Case (5.4 MGD) | 80% ToP Floor (4.32 MGD) |
|---|---|---|
| Reclaimed Water Revenue (@ $2,300/AF) | $13,912,187 | $11,129,749 |
| Cash Flow Available for Debt Service (CFADS) | $8,262,187 | $5,479,749 |
| Non-Recourse Debt Service ($49,500,000 @ 6.50 percent, 18-yr) | $4,744,803 | $4,744,803 |
| Minimum DSCR / LLCR / PLCR | 1.74x / 1.74x / 1.84x | 1.15x |
| 20-Yr Pre-Tax IRR (Unlevered / Levered) | 11.0 percent / 21.1 percent (4.84x EM) | Cash Sweep (<1.20x) |
Optimize federal municipal stacks in CWSRF, WIFIA, and blended municipal wastewater stacks, evaluate DBFOM P3 delivery in wastewater DBFOM P3s, Value for Money, and GASB 94, and model your own water reuse project in the free Wastewater Project Finance and SRF Model (Excel).
Multiply MGD by 1,000,000 gallons and 365 days, then divide by exactly 325,851 gallons per acre-foot. On Cedar Creek, 7.5 MGD equals 8,401 AF/year ($10,501,349 at $1,250/AF); on Mesa Verde, 5.4 MGD equals 6,049 AF/year ($13,912,187 at $2,300/AF).
Residential tap and connection fees ($2,400,000/yr on Cedar Creek) collapse 50 to 80 percent during housing recessions. Institutional underwriting requires clearing the 1.25x senior rate covenant strictly on recurring Core Operating Revenues.
The 2-year contractual tail provides unencumbered post-debt CFADS ($16.52 million across Years 19 and 20), lifting PLCR to 1.84x versus 1.74x LLCR and giving non-recourse lenders a restructuring cushion if membrane fouling or downtime occurs.
This guide is drawn from The Wastewater Treatment Project Finance Handbook, following municipal treatment expansions, DBFOM P3s, and private industrial water reuse projects from NPDES permits through financial close.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Wastewater Project Finance and SRF Model (Excel).