Fees per barrel, skim oil, variable and fixed costs, break-even volume, and what a seismic curtailment does to EBITDA, on a fictional Permian system.
A disposal system looks simple: water in, fee per barrel, water down a well. Here is how the money actually works, barrel by barrel, on a fictional Permian system.
Worked in full in The Saltwater Disposal Well Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Every barrel of oil from a shale well brings several barrels of salty produced water to the surface. Industry press, citing Railroad Commission of Texas data, reported nearly 24 million barrels a day of produced water in the Permian region in 2025. Most of it is injected into deep porous rock through Class II disposal wells. A disposal business gathers that water by pipe or truck, skims off residual oil, injects the rest, and charges the producer a fee per barrel. The figures below come from Coyote Draw Water Midstream, a fictional system worked in full in The Saltwater Disposal Well Finance Handbook. Every fee and cost is an assumption chosen to make the arithmetic visible, not a market quote.
Coyote Draw has four shallow and two deep disposal wells permitted for 180,000 barrels a day. After downtime and pressure management, it counts on 171,000 barrels a day of effective capacity, half of it in the two deep wells. It receives 160,000 barrels a day: 95,000 by pipe from Anchor, a dedicated operator paying $0.62 a barrel, 45,000 from Bluestem at $0.68, and 20,000 by truck from spot customers at $0.75.
| Base year | Amount |
|---|---|
| Disposal fees | $38,142,500 |
| Skim oil | $4,818,000 |
| Variable costs | $6,570,000 |
| Fixed costs | $11,500,000 |
| EBITDA | $24,890,500 |
Fictional case figures computed by the book's deterministic model.
EBITDA margin is 57.9%, or $0.426 per barrel delivered. Variable costs are small: electricity for the pumps at about $0.053 a barrel, chemicals and filtration at $0.025, and a surface royalty to the landowner of $0.03 for every barrel injected, about $0.108 in all. Skim oil, recovered at 0.15% of the water and sold at an assumed $55 a barrel net, adds 11.2% of revenue, and it moves with the oil price.
Most costs are fixed: field labor, overhead, repairs, insurance, property taxes, monitoring, and pipeline integrity, $11,500,000 a year in the case. Each extra barrel adds its fee and skim oil less about $0.108 of variable cost, so the weighted contribution is $0.623 a barrel. The system covers its fixed costs at about 50,563 barrels a day, roughly 32% of its volume. That low break-even is a strength, but it measures operating cash, not credit: capital, taxes, and debt service come on top.
A common error follows from the same fact. The fixed cost per barrel, $0.197 in the base year, is only true at base-year volume. A model that projects costs as a constant cost per barrel treats fixed costs as variable, and in a slowdown it overstates EBITDA by exactly the costs it pretends to save.
A disposal company cannot add capacity at will. Each well needs a permit that caps its pressure and daily volume, and in parts of West Texas and New Mexico regulators have cut or suspended deep disposal because it is linked to earthquakes. The Railroad Commission suspended all deep disposal permits in its Gardendale and Northern Culberson-Reeves seismic response areas, and its 2025 Permian guidelines tie new and amended permits to reservoir pressure and the confining layers.
When capacity falls, the water keeps coming. In the book's curtailment scenario, deep capacity is cut by 50% from the third year. Coyote Draw turns away all of its trucked water and sends 14,867 barrels a day of firm pipeline water to third parties at an assumed $0.48 a barrel. Each offloaded barrel loses $0.455 of margin against its own injection. Third-year EBITDA falls by $7,173,924; if deep injection were suspended altogether, by $14,273,631.
Trucked water contributes $0.685 a barrel, more than pipeline water at $0.595 for Anchor, because spot customers pay for convenience. But trucked customers have no contract, so when capacity runs short they are turned away first, ahead of the dedicated operators whose water the system has promised to take. The first barrels lost in a curtailment are the best ones.
In Texas, the Supreme Court held in Cactus Water Services v. COG Operating, decided June 27, 2025, that produced water is by default oil and gas waste belonging to the lessee under an ordinary oil and gas lease. That makes the operator the disposal company's counterparty. The operator pays the fee; the disposal company pays its own costs, including a royalty or rental per barrel to the owner of the land on which each well sits, and, when it cannot inject a barrel itself, the fee of another disposal company that takes the overflow. It also sells the skim oil it recovers, usually at a deduction to a benchmark price.
In Texas, disposal into formations that are not productive of oil or gas falls under Statewide Rule 9. A permit fixes the receiving formation, the maximum surface pressure, and the maximum daily volume. Each well must pass a mechanical integrity test at least every five years and after every workover, and injection pressure and rate are monitored at least monthly. Those rules feed straight into the numbers: rate caps capacity, pressure lowers it as formations fill, testing drives the workover cycle, and monitoring adds cost. In seismic review areas, regulators often ask for downhole pressure gauges and more frequent reporting, which is capital spending before it is anything else.
Contracts are the next layer: see how produced water contracts work. For loans, coverage, and value, see how to finance a water midstream system. Neighboring topics are covered in The Oil and Gas Accounting Handbook and The Natural Gas Storage Handbook. To run your own system, download the free Saltwater Disposal Model (Excel).
It depends on power, chemicals, the surface royalty, and fixed costs. In the book's fictional case, variable cost is about $0.108 a barrel injected and fixed costs add $0.197 a barrel at base-year volume.
Because trucked customers have no contract, while dedicated pipeline water must be taken under the agreements. The system turns away spot water before it offloads firm water.
No. It describes methods with fictional figures. Rules are described in principle as checked in November 2026.
This guide is drawn from The Saltwater Disposal Well Finance Handbook, which follows a fictional water midstream system from the wellhead through permits, seismicity, contracts, the overflow waterfall, costs, adjustments, capital, taxes, debt, a recycling project, and value.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Saltwater Disposal Model (Excel).