How PJM Base Residual Auctions work: Forecast Pool Requirement, VRR Points A, B and C, marginal ELCC class ratings and administrative price collars.

Between the 2025/2026 and 2027/2028 delivery years, PJM Base Residual Auction clearing prices jumped from $269.92/MW-day to administrative price caps of $329.17 and $333.44/MW-day. Two mechanical levers drove that shift: marginal ELCC accreditation under FERC Docket No. ER24-99 and the steep upper slope of the Variable Resource Requirement (VRR) demand curve.

Worked in full in The Capacity Market Handbook by Julian R. Sterling, with every figure reproduced in a free 11-tab workbook.See the book →

Step 1: From 50/50 Peak Load to UCAP Reliability Requirement

Every PJM auction starts by converting a 50/50 coincident peak load forecast into an Unforced Capacity (UCAP) target using the Forecast Pool Requirement (FPR = (1 + IRM) x Pool-Wide Accreditation Factor). In our teaching case, a 152,000 MW peak load, a 17.8% Installed Reserve Margin and an 82.0% pool accreditation factor yield an FPR of 0.9660 and a System Reliability Requirement of 146,826 MW UCAP.

Step 2: VRR Curve Geometry and Administrative Collars

The piecewise VRR curve is anchored to Gross CONE ($634.15/MW-day UCAP) and Net CONE ($378.05/MW-day UCAP in our Base Case): Point A sits at 99.0 percent of reliability requirement (145,358 MW) at the greater of Gross CONE or 1.50 times Net CONE ($634.15/MW-day; PJM's Fifth Quadrennial Review raised the multiplier to 1.75x with Points B and C at 101.5% and 104.5% for 2026/2027+); Point B sits at 101.7 percent (149,322 MW) at $283.54/MW-day; Point C hits $0.00 at 106.8 percent (156,810 MW). Between Point B and Point A, the slope steepens to $88.44/MW-day per 1,000 MW of supply shift, which is why temporary caps ($333.44/MW-day cap, $179.55/MW-day floor) were adopted to bound consumer bill volatility.

Step 3: Marginal ELCC Ratings Cut Accredited UCAP

Under ER24-99 marginal ELCC rules, 2026/2027 PJM class ratings credited Nuclear at 95%, Gas CC at 74%, Demand Response at 72%, Gas CT at 60%, 4-hour BESS at 50% and Tracking Solar at 11%. Across Alderbrook Power Holdings' 740 MW nameplate fleet, marginal ELCC converts installed megawatts into 427.20 MW UCAP (57.73% weighted average). A 10-percentage-point ELCC drop on CCGT-1 and Bramwell BESS removes $6,055,350 of annual revenue at constant clearing prices.