Natural Gas Storage Contracts: FSS, ISS, Park and Loan, and FERC Order 712 AMAs

How storage hubs structure take-or-pay FSS stacks, NAESB cycles, and merchant PAL books to clear project finance debt tests.

Underground storage revenue splits between bankable Firm Storage Service (FSS) take-or-pay demand charges and volatile Park and Loan (PAL) hub fees. Here is how operators structure FSS, ISS, PAL, and FERC Order 712 Asset Management Agreements to hit 1.16x contracted debt coverage.

Worked in full in The Natural Gas Storage Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →

The Four Commercial Storage Products

Under FERC Order No. 636 open-access rules and Order No. 678 Market-Based Rates, independent storage hubs monetize working gas capacity through four distinct contract structures. Sabine Dome Storage Partners, LLC, Gulfstream Midstream Partners, and the Appalachian comparator are fictional, and all costs, spreads, and fees are planning assumptions. This article is educational and is not legal, tax, engineering, or investment advice.

Contract TypePriorityFee StructureLender Bankability
Firm Storage Service (FSS)Highest (non-bumpable)Monthly demand + commodity + fuelCore debt sizing
Interruptible Storage (ISS)Lowest (bumpable)Daily inventory + volumetric feeZero contracted credit
Park and Loan (PAL)Negotiated / InterruptibleShort-term flat spread feeHaircut 50% to 100%
Asset Mgmt. Agreement (AMA)Released Firm (Order 712)Fixed optimization fee / splitSupports LDC renewals

Sabine Dome's Contract Stack and Dual-Lens Debt Coverage

In The Natural Gas Storage Handbook, Sabine Dome contracts 22.5 Bcf (75.0 percent of its 30.0 Bcf capacity) under anchor FSS agreements: 10.0 Bcf to a Gulf Coast LNG terminal at $0.22/MMBtu-mo (7 years, $26.4 million/yr), 7.5 Bcf to a gas-fired power utility at $0.20/MMBtu-mo (5 years, $18.0 million/yr), and 5.0 Bcf to a regional LDC/marketer at $0.18/MMBtu-mo (5 years, $10.8 million/yr). Weighted average FSS demand revenue equals $55,200,000/yr ($0.204/MMBtu-mo), plus $3,600,000/yr in commodity fees ($0.02/MMBtu each way across 4.0 turns), totaling $58.8 million/yr contracted revenue.

The remaining 7.5 Bcf (25.0 percent) earns $21.6 million/yr ($0.24/MMBtu-mo equivalent) via Park and Loan, ISS, and hub wheeling. Against $33.17 million of annual senior debt service on a $260.0 million 12-year loan (7.25 percent), Sabine Dome achieves 1.81x Total DSCR and 1.16x Contracted-Only DSCR (surviving $0.00 merchant revenue across the entire 12-year loan life with a 1.01x minimum).

Five Contract Clauses That Make or Break Underwriting

Stress-test your own FSS vs. PAL contract mix in the free Natural Gas Storage Valuation Model (Excel). Compare the underlying rock physics in salt cavern vs. depleted reservoir gas storage economics, and see how marketers price these contracts in natural gas storage valuation: intrinsic vs. extrinsic spreads.

Questions practitioners ask

What is the difference between a Gas Park and a Gas Loan?

In a Park, a shipper delivers temporary surplus gas to the hub and withdraws it later for a fee. In a Loan, the hub lends physical gas to a short shipper to be returned later, requiring strict LC collateral equal to 110 to 125 percent of forward market value.

What makes an Asset Management Agreement exempt under FERC Order No. 712?

Under FERC Order No. 712, a storage AMA is exempt from competitive bidding and anti-tying rules if the Asset Manager assumes a binding delivery or purchase obligation to serve the releasing utility for at least five months of a 12-month term.

What Contracted-Only DSCR do midstream storage lenders require?

Because merchant PAL and ISS revenues fluctuate with weather and volatility, project finance lenders typically require committed FSS contracts alone to clear at least 1.00x to 1.15x annual debt service (1.16x in Year 1 at Sabine Dome).

Read the full handbook

This guide is drawn from The Natural Gas Storage Handbook, following the fictional 30.0 Bcf Sabine Dome Storage Hub through subsurface engineering, FERC/PHMSA rules, storage contracts, spread valuation, project debt, and M&A multiples.

Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks

Free download: Natural Gas Storage Valuation Model (Excel).

Illustrative figures computed by the book model; the Sabine Dome Storage Partners case is fictional and its costs, spreads, and rates are planning assumptions. Education only, not legal, tax, engineering, or investment advice.