The Material Assistance Cost Ratio (MACR) is the binary supply chain test governing sections 45Y, 48E, and 45X after 2025. Below are the statutory thresholds through 2030, the three Notice 2026-15 safe harbors, and worked solar, battery storage, and inverter calculations.
Worked in full in The Foreign Entity of Concern Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Under Internal Revenue Code section 7701(a)(52), enacted by P.L. 119-21, a clean energy facility (sections 45Y and 48E), energy storage technology (section 48E), or eligible component (section 45X) is disqualified from earning tax credits if it includes material assistance from a Prohibited Foreign Entity (defined in the Prohibited Foreign Entity (SFE and FIE) rules). Material assistance is tested quantitatively through the Material Assistance Cost Ratio (MACR):
MACR = (Total Direct Costs minus PFE Direct Costs) divided by Total Direct Costs
Higher is better: the ratio measures the non-PFE share of direct manufactured product costs (for sections 45Y and 48E) or direct material costs under sections 461 and 263A (for section 45X). If the ratio falls below the statutory threshold percentage for the applicable calendar year, the credit is reduced to zero.
For sections 45Y and 48E, the threshold is locked in by the calendar year in which construction begins (projects beginning construction on or before December 31, 2025 are grandfathered out of MACR). For section 45X, the threshold is tested every year by calendar year of sale:
| Technology / Component | 2026 | 2027 | 2028 | 2029 | 2030+ |
|---|---|---|---|---|---|
| Qualified Facilities (45Y / 48E) | 40.0% | 45.0% | 50.0% | 55.0% | 60.0% |
| Energy Storage / BESS (48E) | 55.0% | 60.0% | 65.0% | 70.0% | 75.0% |
| 45X Solar Components | 50.0% | 60.0% | 70.0% | 80.0% | 85.0% |
| 45X Inverters (All 6 Types) | 50.0% | 55.0% | 60.0% | 65.0% | 70.0% |
| 45X Qualifying Battery Components | 60.0% | 65.0% | 70.0% | 80.0% | 85.0% |
Wind components under section 45X face thresholds of 85.0 percent in 2026 and 90.0 percent in 2027 before terminating after 2027. Applicable critical minerals start at 0.0 percent through 2029 and ramp from 25.0 percent in 2030 to 50.0 percent after 2032.
IRS Notice 2026-15 (issued February 12, 2026) provides two calculation routes until final regulations and updated tables are issued. Under section 3, taxpayers trace actual direct manufactured product costs or section 263A direct material costs (generally including inbound freight and customs duties). Under section 4, eligible taxpayers may elect three interim safe harbors: the Identification Safe Harbor (limiting scope to listed products in Notices 2023-38, 2024-41, and 2025-08 while disregarding unlisted items and structural steel), the Cost Percentage Safe Harbor (using Notice 2025-08 pre-assigned cost weights), and the Certification Safe Harbor (relying on direct-supplier certifications signed under penalties of perjury, bearing an EIN or foreign TIN, retained for 6 years, absent knowledge or reason to know of inaccuracy).
Vespera Clean Power Holdings, LLC (a fictional U.S. developer and manufacturer with invented figures) runs all three MACR pathways across its 2026 portfolio totaling $177,000,000 in federal credits:
| Vespera 2026 Asset | Total DMPC / DMC | PFE Cost | Actual MACR | 2026 Bar & Result |
|---|---|---|---|---|
| Mesa Verde Solar (48E, $84,000,000 ITC) | $160,000,000 | $94,000,000 | 41.3 percent | 40.0% (Pass; 49.4% SH) |
| Redrock BESS Initial ($63,000,000 at risk) | $150,000,000 | $78,000,000 | 48.0 percent | 55.0% (FAIL) |
| Redrock BESS Remediated ($66,000,000 ITC) | $160,000,000 | $64,000,000 | 60.0 percent | 55.0% (PASS) |
| Cimarron Inverters (45X, $27,000,000 PTC) | $144,000,000 | $64,800,000 | 55.0 percent | 50.0% (PASS; fails 2028) |
On Mesa Verde Solar (250 MWdc, $280,000,000 qualified basis, March 2026 construction start), actual cost tracing gives $66,000,000 non-PFE divided by $160,000,000 DMPC, or 41.25 percent (41.3 percent), passing 40.0 percent by only 1.25 points. Electing the Notice 2026-15 Cost Percentage Safe Harbor under the authentic Notice 2025-08 ground-mount tracking table (28.7 percent non-PFE tracker APC + 19.6 percent non-PFE module frame, glass, encapsulant, and backsheet + 1.1 percent non-PFE inverter thermal management and enclosure/skids) lifts Mesa Verde to 49.4 percent without extra capex. If construction slipped to 2027 (45.0 percent threshold) after interim safe harbor reliance expires, an $8,000,000 re-sourcing plan lifts qualified basis to $288,000,000, ITC to $86,400,000, and actual-cost MACR to 61.9 percent ($78,400,000 net credit-adjusted gain).
On Redrock Storage (150 MW / 600 MWh LFP BESS, May 2026 construction start), the initial bid ($210,000,000 basis) scores 48.0 percent and fails the 55.0 percent EST bar, wiping out $63,000,000 of ITC. By executing a $10,000,000 remediation plan (switching a dedicated cell tranche and the PCS to non-PFE vendors), Redrock lifts basis to $220,000,000, ITC to $66,000,000, and MACR to 60.0 percent, delivering a $56,000,000 net gain. On Cimarron Power Electronics (1,800 MWac at 1.5 cents per AC watt), the 55.0 percent 2026 MACR clears 2026 and 2027, while a $7,200,000 IGBT re-sourcing plan lifts MACR to 75.0 percent ahead of the 2028 cliff ($19,800,000 net annual gain).
The trap: assuming a pre-June 16, 2025 binding written contract always helps your MACR. Excluding $12,000,000 of PFE modules on Mesa Verde reduces DMPC to $148,000,000 and PFE to $82,000,000, lifting MACR to 44.6 percent. Conversely, excluding $12,000,000 of non-PFE U.S. trackers cuts non-PFE to $54,000,000 over $148,000,000, dropping MACR to 36.5 percent and destroying the credit! Equally dangerous is ignoring post-COD operational control (see effective control, IP licensing, and 10-year recapture rules).
Overstating the MACR triggers a 6-year assessment statute of limitations under section 6501(o), lowers the corporate substantial understatement threshold from 10 percent to 1 percent under section 6662(m) (20 percent penalty), and exposes section 6418 credit buyers to a 20 percent excessive transfer penalty ($16,800,000 on an $84,000,000 Mesa Verde disallowance, totaling $100,800,000). Run your own projects through the free FEOC and MACR Compliance Calculator, or read the full line-by-line methodology in The Foreign Entity of Concern Handbook.
MACR equals (Total Direct Costs minus PFE Direct Costs) divided by Total Direct Costs. If the ratio is below the statutory threshold percentage for the applicable year and technology, material assistance exists and the tax credit is disqualified.
For construction beginning in calendar year 2026, qualified electricity-generating facilities (including solar and wind) must achieve at least 40.0 percent non-PFE MACR, while Energy Storage Technologies (BESS) must achieve at least 55.0 percent.
Only listed eligible components: the six inverter types, solar modules, and battery modules using cells when directly incorporated into battery storage. Solar cells, wafers, polysilicon, battery cells, torque tubes, wind components, and critical minerals require actual cost tracing.
At least 6 years, matching the extended 6-year IRS assessment statute of limitations under IRC section 6501(o) for section 7701(a)(52) determinations.
Rules and figures checked on 26 November 2026.
Worked in full in The Foreign Entity of Concern Handbook with live Excel workbooks and model contract clauses.
Paperback PDF edition, $19.99 Book page and companion workbooks
Free download: FEOC & MACR Compliance Calculator (Excel).