Divide paid wash cycles by the number of washers and the days in the period, then read the result by machine size.
Turns per day is the number of paid wash cycles the average washer runs in a day: cycles divided by washers divided by days. A store with 42 washers that ran 58,035 self-serve cycles in a year averages 3.79 turns a day. The average hides the sizes: small washers turn most, large ones earn more per machine.
Turns per day = self-serve wash cycles in the period / number of washers / days in the period. Count only cycles paid at the machine (wash-dry-fold loads are paid by the pound), keep every washer in the denominator even when it was broken, and divide by every day the store was open. A figure built on other choices can look higher for the same store.
Turns per day = cycles ÷ washers ÷ days
The fictional store of the book, Penlowe Street Laundromat, ran 58,035 self-serve cycles in its trailing twelve months on 42 washers, open every day: 58,035 / 42 / 365 = 3.79 turns a day.
| Size | Washers | Turns a day | Revenue a washer a day, with dryer time |
|---|---|---|---|
| 20 lb | 16 | 4.6 | $27.60 |
| 30 lb | 12 | 3.9 | $32.18 |
| 40 lb | 8 | 3.2 | $33.60 |
| 60 lb | 4 | 2.4 | $35.40 |
| 80 lb | 2 | 1.7 | $31.45 |
The 20-lb washers turn 4.6 times a day and earn $27.60 each with the dryer time that follows. The 60-lb washers turn only 2.4 times but earn $35.40. Compare sizes by revenue per washer per day, not by turns alone.
Worked in full in The Laundromat Owner by Julian R. Sterling.Get the DRM-free PDF, $19.99 →or the paperback
Free: the laundromat acquisition model in Excel, from net income to SDE, the offer and the SBA 7(a) loan with its checks.
In the case a washer is tied up 35 minutes a cycle, so 16 open hours allow 27.4 cycles. The store's 3.79 turns use 13.8 percent of that. Most of the idle time sits in quiet hours: the machines exist for the weekend peak.
The trap: never annualize a season. In the case, January ran 5,424 cycles and June 4,438. Use twelve months.
Split costs into those that move with each load and those that do not. In the case, an average self-serve cycle contributes $6.39 after utilities and card fees. With every attendant hour paid, the store needs 2.30 turns a day to cover its fixed costs, 3.10 to pay its SBA loan as well, and 3.30 to keep debt service coverage at 1.25.
Machine counters, the card system's reports by machine, and the coin records. Then test the total against the water bills, which the seller does not write: see how to verify laundromat revenue with the water bill.
Figures checked on 17 November 2026. The store in the examples is fictional and its figures are teaching assumptions, not market norms. Not legal, tax or lending advice.
There is no single benchmark: it depends on machine sizes, prices, open hours and costs. Compute the turns your own store needs to cover its fixed costs and its debt, and compare.
Not in this method. They are paid by the pound at the counter, so counting them as turns would overstate use at the vend price.
They serve bulky items and big family loads, which come less often, but they charge more per cycle and can earn more per machine.