Articles

How to price septic tank pumping: tank size, digging and disposal

Price by tank size, charge for digging, and keep the disposal fee and the trip to the plant in view every time either changes.

In the worked case, pump-out prices run from $395 for a 1,000-gallon tank to $525 for a 1,500-gallon tank, with $85 for digging up buried lids. A routine pump-out leaves $225.70; the same tank four years later, with a riser and a reminder, earns more per truck hour; a real estate inspection leaves $604.01.

Worked in full in The Septic Service Business Owner by Julian R. Sterling.Get the DRM-free PDF, $19.99 →or the paperback

Free: the septic service business model in Excel, with the whole Hollis Creek case: truck hours and jobs, a job calculator for pump-outs, inspections and grease traps, the service line, the reminder list, the P&L, break-even, seasons and cash, a three-year plan and valuation.

What a pump-out price has to cover

A pump-out price covers the truck's time (travel, finding and opening the tank, pumping, and its share of the trip to unload), the disposal fee on the gallons, the fuel, and a share of the operators, trucks and overhead. Digging and extras are priced separately. The figures below are a fictional company's.

Digging and locating $85; filter cleaning $35; riser installed $375; septage disposal $90 per 1,000 gallons. Fictional case.
Price list, Hollis Creek (case)Pump-out priceShare of jobsDisposal on a full tank
1,000-gallon tank$39545%$90.00
1,250-gallon tank$45530%$112.50
1,500-gallon tank$52525%$135.00

The steps between sizes are larger than the extra disposal fee, on purpose: a larger tank takes longer to pump and fills the truck sooner.

Example 1: a routine pump-out, lids dug

Fictional case.
Routine pump-out, 1,000 gallonsAmount
Price (pump-out + digging)$480
Disposal$90.00
Operator time$66.69
Fuel$49.40
Card fee$13.92
Lead cost$34.29
Contribution$225.70 (47.0%)
Contribution per truck hour$118.79

Example 2: the same tank four years later, with a riser

The household books from a reminder, so there is no lead cost, and the riser installed the first time means there is nothing to dig. The job takes 1.5 truck hours instead of 1.90 and earns $201.89: less in dollars, because the digging fee is gone, but $134.60 per truck hour against $118.79.

The riser pays twice: a margin of $235 on the day it is sold, and a shorter job every time the tank is pumped after that.

Example 3: a real estate inspection

An inspection on a 1,500-gallon tank adds a $350 fee for the report to the pump-out and the digging: $960 in all. It takes 2.60 truck hours and leaves $604.01, or $232.31 per truck hour, the best-paid hour in the case.

The trap: absorbing a disposal fee increase. In the case, a rise of $15 per 1,000 gallons costs $16.92 on the average job and 11.2% of adjusted EBITDA over a year. Review prices every time the plant changes its fee.

Sources

  1. U.S. EPA, How to care for your septic system
  2. 40 CFR part 503, Standards for the use or disposal of sewage sludge

Figures checked on 18 November 2026. Illustrative case assumptions, not market data, and not legal, tax, insurance, environmental, transport or licensing advice. The company in the examples is fictional.

Questions readers ask

How do septic companies price a pump-out?

Most price by tank size or by the gallon pumped, add a fee for locating and digging buried lids, and charge separately for extras such as filter cleaning, risers and emergency service. Behind the price sit the truck time, the disposal fee per gallon and the overhead.

Why does a larger tank cost more to pump?

It takes longer, it carries a higher disposal fee, and it fills the truck sooner, which brings forward the trip to unload.

How often should a septic tank be pumped?

The U.S. EPA says a typical household system is generally pumped every three to five years, depending on the household and the tank. The book's case recommends four years for a typical household.

Should the disposal fee be shown on the invoice?

Some companies show it as a separate line so that a fee change can flow through; others keep one price per tank and review it every year. Either works if someone checks the plant's fee against the price list.

Read the whole book

This article is one calculation from The Septic Service Business Owner, a practitioner’s guide to starting, buying, running and selling a septic pumping and service company: pricing by tank and gallon, disposal fees, vacuum trucks and routes, real estate inspections, aerobic service contracts, grease traps, licenses, cash flow and valuation.

Also on this site