How to price a channel letter sign

Count the fabricator-hours and crew-days first, put the permit inside the self-performed cost, apply the markup, bill the electrician on its own line, and track the hours actually spent.

In the worked case, channel letters on a storefront cost $7,665.40 to make and install, permit included; a 55% markup and the electrician's circuit bring the price to $12,980, or $68.30 per labor hour of the job. Remade faces cut it to $46.57.

Worked in full in The Sign Company Owner by Julian R. Sterling.Get the DRM-free PDF, $19.99 →or the paperback

Free: the sign company business model in Excel, with the whole Quillmont case: the exterior sign line with its labor hours, the channel letter bid and its overrun, graphics by the graphics-hour, service and maintenance agreements, the P&L with reported and adjusted EBITDA, break-even, the cash floor and two offers for the company.

Count the hours before the price

A channel letter sign is sold on a drawing and paid for in labor hours: returns bent to each letter, faces cut and fitted, LED modules laid out, a power supply and a raceway, then a crew on a boom truck. The estimator counts those hours first, then the materials and the outside costs, and only then applies a markup. The figures below are the worked bid of a fictional company; the markup is the company's own rule, not a market price.

Example 1: the bid, line by line

Illuminated channel letters on a retail storefront, fictional case of the book. Loaded rates are wage plus burden.
Line, worked bid (case)Amount
Materials at cost (letters, LED modules, power supply, raceway)$4,850
Fabricator time, 46 hours at $34.02 loaded$1,564.92
Install crew time, 1 crew-day at $564.48 loaded$564.48
Fuel$36
Permit fee and permit drawing$650
Self-performed cost$7,665.40
Self-performed price, cost plus 55%, rounded up to the next $100$11,900
Electrician's primary circuit, subcontract billed at cost plus markup$1,080
Total price$12,980

The permit fee and permit drawing are a cost line inside the self-performed cost, so the markup applies to them as it does to the materials and the hours. Whether a jurisdiction needs a sign permit, an electrical permit or sealed calculations is a question for its permit office, asked on each job. The electrician's circuit is billed on its own line, at its cost of $900 plus the company's subcontract markup. The deposit at order is half the price, $6,490, held for the install: it is a liability until the sign is on the wall, not cash to spend.

Contribution of the job = $11,900 − $7,665.40 = $4,234.60, subcontract excluded

Per labor hour of the job = $4,234.60 / 62 hours (shop plus crew) = $68.30

That figure carries only the job's own loaded hours. The company's year figure, $51.72 per labor hour, carries the wages of every paid hour, booked to a job or not; the gap between the two is the cost of the hours no job pays for, not a finding about this bid.

Example 2: the same bid after the faces are remade

The faces come out of the shop in a color that does not match the signed proof, and the shop remakes them. The error is the shop's, so the price stays where it was. The job takes 58 fabricator-hours instead of 46: 12 more hours cost $408.24 at the loaded rate, and the acrylic and vinyl of the new faces $380 at cost, $788.24 in all.

Contribution after the remake = $4,234.60 − $788.24 = $3,446.36

Per labor hour of the job = $3,446.36 / 74 hours = $46.57

The trap: counting rework in hours only. A remade face uses material as well as time; leaving the acrylic out would make the error look $380 cheaper than it was.

Two costs that belong in every installation estimate

The crew's drive from the shop to the site is paid time: under 29 CFR 785.38, travel from job site to job site during the workday counts as hours worked, and so does travel after reporting to a meeting place to pick up tools or instructions. And the overhead lines at the site are recorded in the estimate: where the federal crane rule covers the lift, 29 CFR 1926.1408 requires the employer to take one of its options before work starts if any part of the equipment or the load could come within 20 feet of a power line up to 350 kV, which may mean a call to the utility and a day that does not start on time. The case treats its boom trucks that hold a sign while it is fastened as cranes; whether a real lift is covered is for a safety consultant.

Sources

  1. 29 CFR 785.38, Travel that is part of the day's work
  2. 29 CFR 1926.1408, Power line safety (up to 350 kV), equipment operations

Rules read on the eCFR, irs.gov and sba.gov and in published summaries in November 2026; figures checked on 20 November 2026. Every price, wage, cost and multiple on this page is an illustrative assumption of a fictional company, not market data, and nothing here is legal, tax, employment, safety, insurance, engineering, electrical or licensing advice.

Questions readers ask

How much do channel letter signs cost?

It depends on the letters, the hours to build and install them, the permit and the electrical work. In the worked case, a storefront set comes to $12,980, of which $1,080 for the electrician's circuit. This is a teaching assumption, not a market price.

What markup should a sign shop use?

The case uses its own rule, 55% on self-performed cost, rounded up to the next $100, with subcontracted work marked up separately. The right markup for a real shop comes from its own hours, overhead and target, not from a published figure.

Should the permit be marked up?

In the case, yes: the permit fee and permit drawing are a cost line inside the self-performed cost that carries the markup. Whatever a shop decides, the bid should say it once and apply it the same way on every job.

How much deposit should a sign company take?

The case takes half the price at order, $6,490 on this bid, and holds it as a liability until the sign is installed.

Read the whole book

This article is one calculation from The Sign Company Owner, a practitioner’s guide to starting, buying, running and selling a sign and graphics company: bids and labor hours, permits and engineering, the shop and the install crews, vehicle wraps, service agreements, contractor packages and retainage, cash flow and valuation.