For cement CBAM counts electricity too, and the clinker ratio does most of the work. Leaving out the indirect emissions under-declares almost a tenth.
CBAM specific embedded emissions of cement are the grinding process's direct and indirect emissions plus the clinker consumed times the clinker's own specific embedded emissions, all divided by the tonnes of cement produced. On an illustrative integrated plant with clinker at 0.906 tonnes of CO2e a tonne and a clinker ratio of 0.76, the answer is 0.7226 tonnes of CO2e per tonne of cement. Unlike steel, the electricity counts: leaving it out under-declares by 9.8 per cent.
Worked in full in The CBAM Compliance Handbook by Julian R. Sterling, with every figure reproduced in a free workbook.See the book on Amazon →
Under Annex IV of Regulation (EU) 2023/956, the CBAM Regulation, cement is a complex good whose relevant precursor is cement clinker, itself a CBAM good. Each production process gets its own specific embedded emissions, and the precursor's figure is carried into the product's. Cement and fertilisers are the categories for which indirect emissions, those of the electricity consumed, are counted alongside direct emissions; iron and steel, aluminium and hydrogen count direct emissions only in the definitive period, as worked for an aluminium product in CBAM embedded emissions for aluminium products.
SEEclinker = (Directclinker + MWhclinker × EF) / Clinker produced
SEEcement = (Directgrinding + MWhgrinding × EF + Clinker consumed × SEEclinker) / Cement produced
Excel: =(DirGrind+MWhGrind*EF+ClinkerUsed*SEEClinker)/CementOut
EF is the electricity emission factor. By default it is the factor of the grid in the country of origin; an actual factor is allowed only under the conditions Annex IV sets out, such as a direct technical link to a generator or a qualifying power purchase agreement.
A fictional integrated cement works outside the EU makes its own clinker in a kiln and grinds it with gypsum and limestone. Every figure is illustrative, chosen to be a plausible order of magnitude, not a published value.
| Input | Value |
|---|---|
| Clinker produced, tonnes | 800,000 |
| Direct emissions of the clinker process (calcination and kiln fuel), tCO2e | 680,000 |
| Electricity consumed by the clinker process, MWh | 64,000 |
| Cement produced, tonnes | 1,000,000 |
| Clinker consumed in grinding, tonnes | 760,000 |
| Direct emissions of grinding (dryers), tCO2e | 6,000 |
| Electricity consumed by grinding, MWh | 40,000 |
| Grid emission factor, tCO2e per MWh | 0.70 |
| Cement imported into the EU in the year, tonnes | 50,000 |
Step 1, the clinker. The kiln's electricity is 64,000 × 0.70 = 44,800 tonnes. Add the 680,000 of direct emissions and divide by the 800,000 tonnes of clinker: 0.906 tonnes per tonne, of which 0.850 is direct and 0.056 indirect.
Step 2, the grinding process. The mills' electricity is 40,000 × 0.70 = 28,000 tonnes, plus 6,000 direct from the dryers.
Step 3, the precursor carried in. Only the clinker consumed counts, 760,000 tonnes, a clinker ratio of 0.76. The other 40,000 tonnes were sold or stocked and carry their own embedded emissions wherever they go.
Precursor = 760,000 × 0.906 = 688,560 tCO2e
Total = 6,000 + 28,000 + 688,560 = 722,560 tCO2e
SEEcement = 722,560 / 1,000,000 = 0.7226 tCO2e per tonne
| Component | tCO2e |
|---|---|
| Grinding, direct | 0.006 |
| Grinding, indirect | 0.028 |
| Clinker precursor, direct and indirect | 0.6886 |
| Specific embedded emissions | 0.7226 |
The clinker carries 95.3 per cent of the cement's embedded emissions. The importer of 50,000 tonnes declares 36,128 tonnes of CO2e. That volume is far above the 50-tonne annual de minimis threshold introduced by the 2025 simplification of CBAM, whose arithmetic is worked in is it worth staying under the CBAM 50 tonne threshold. Split by type, 0.6520 per tonne is direct and 0.0706 indirect. At an illustrative 80 euros a certificate, once free allocation has been phased out, the full exposure is 2,890,240 euros, 57.80 per tonne of cement; the certificates surrendered in the early years are reduced by the free-allocation adjustment and by any carbon price effectively paid in the country of origin. How the factor phases in is worked, for steel, in how much CBAM will cost per tonne of steel from 2026 to 2034.
| Variant | Clinker SEE | Cement SEE | Declared, tCO2e |
|---|---|---|---|
| Clinker ratio 0.65 (more limestone or slag) | 0.906 | 0.6229 | 31,145 |
| Base case, ratio 0.76, grid 0.70 | 0.906 | 0.7226 | 36,128 |
| Clinker ratio 0.90 | 0.906 | 0.8494 | 42,470 |
| Grid factor 0.20 (low-carbon grid) | 0.866 | 0.6722 | 33,608 |
| Grid factor 0.90 (coal-heavy grid) | 0.922 | 0.7427 | 37,136 |
The clinker ratio dominates. Each 0.01 of ratio moves the cement figure by 0.0091, 453 tonnes on this import. The grid matters less: the plant uses 0.1008 MWh per tonne of cement through the clinker and the mills together, so each 0.10 of grid factor is worth 0.0101, about 504 tonnes. For a buyer comparing two cement suppliers, the blend is the first question and the power source the second.
The quarterly cash profile, the certificate buffer and a blank model for your own imports are in the free workbook for this book; the same method for a steel product is worked in how to calculate CBAM embedded emissions for a steel product.
Yes. Cement and fertilisers count the emissions of the electricity consumed in production, unlike iron and steel, aluminium and hydrogen, which count direct emissions only. In the worked plant the indirect part is 0.0706 of the 0.7226 tonnes per tonne of cement, 9.8 per cent, or 3,528 tonnes on a 50,000 tonne import.
Almost one for one, because clinker is the precursor that carries the kiln's process and fuel emissions. In the worked plant each 0.01 of clinker ratio adds 0.0091 tonnes per tonne of cement, 453 tonnes on a 50,000 tonne import. Moving from a ratio of 0.76 to 0.65 cuts the SEE from 0.7226 to 0.6229.
By default, the emission factor of the grid in the country of origin. An actual factor can be used only under the conditions set out in Annex IV of the regulation, such as a direct technical link to a generator or a qualifying power purchase agreement. In the worked plant each 0.10 of grid factor moves the cement SEE by 0.0101, about 504 tonnes on the import.
This article is one calculation from The CBAM Compliance Handbook. The book takes the same case from first principles to the decision, chapter by chapter, and every figure it prints is a live formula in the free companion workbooks.
Get the book on Amazon →Free companion files
Also on Amazon UK · Amazon Germany · Amazon France · Amazon Canada
Reading guide: regulation, compliance and banking → · All 681 articles →
If this book helped, or didn’t, a few lines on Amazon are worth more than they look: they are what the next reader goes on. Write a review. The workbook stays free either way.