CBAM specific embedded emissions of cement are the grinding process's direct and indirect emissions plus the clinker consumed times the clinker's own specific embedded emissions, all divided by the tonnes of cement produced. On an illustrative integrated plant with clinker at 0.906 tonnes of CO2e a tonne and a clinker ratio of 0.76, the answer is 0.7226 tonnes of CO2e per tonne of cement. Unlike steel, the electricity counts: leaving it out under-declares by 9.8 per cent.

Worked in full in The CBAM Compliance Handbook by Julian R. Sterling, with every figure reproduced in a free workbook.See the book on Amazon →

The formula

Under Annex IV of Regulation (EU) 2023/956, the CBAM Regulation, cement is a complex good whose relevant precursor is cement clinker, itself a CBAM good. Each production process gets its own specific embedded emissions, and the precursor's figure is carried into the product's. Cement and fertilisers are the categories for which indirect emissions, those of the electricity consumed, are counted alongside direct emissions; iron and steel, aluminium and hydrogen count direct emissions only in the definitive period, as worked for an aluminium product in CBAM embedded emissions for aluminium products.

SEEclinker = (Directclinker + MWhclinker × EF) / Clinker produced

SEEcement = (Directgrinding + MWhgrinding × EF + Clinker consumed × SEEclinker) / Cement produced

Excel: =(DirGrind+MWhGrind*EF+ClinkerUsed*SEEClinker)/CementOut

EF is the electricity emission factor. By default it is the factor of the grid in the country of origin; an actual factor is allowed only under the conditions Annex IV sets out, such as a direct technical link to a generator or a qualifying power purchase agreement.

The assumptions

A fictional integrated cement works outside the EU makes its own clinker in a kiln and grinds it with gypsum and limestone. Every figure is illustrative, chosen to be a plausible order of magnitude, not a published value.

Plant data for the reporting period
InputValue
Clinker produced, tonnes800,000
Direct emissions of the clinker process (calcination and kiln fuel), tCO2e680,000
Electricity consumed by the clinker process, MWh64,000
Cement produced, tonnes1,000,000
Clinker consumed in grinding, tonnes760,000
Direct emissions of grinding (dryers), tCO2e6,000
Electricity consumed by grinding, MWh40,000
Grid emission factor, tCO2e per MWh0.70
Cement imported into the EU in the year, tonnes50,000

The calculation, step by step

Step 1, the clinker. The kiln's electricity is 64,000 × 0.70 = 44,800 tonnes. Add the 680,000 of direct emissions and divide by the 800,000 tonnes of clinker: 0.906 tonnes per tonne, of which 0.850 is direct and 0.056 indirect.

Step 2, the grinding process. The mills' electricity is 40,000 × 0.70 = 28,000 tonnes, plus 6,000 direct from the dryers.

Step 3, the precursor carried in. Only the clinker consumed counts, 760,000 tonnes, a clinker ratio of 0.76. The other 40,000 tonnes were sold or stocked and carry their own embedded emissions wherever they go.

Precursor = 760,000 × 0.906 = 688,560 tCO2e

Total = 6,000 + 28,000 + 688,560 = 722,560 tCO2e

SEEcement = 722,560 / 1,000,000 = 0.7226 tCO2e per tonne

Where the 0.7226 comes from, per tonne of cement
ComponenttCO2e
Grinding, direct0.006
Grinding, indirect0.028
Clinker precursor, direct and indirect0.6886
Specific embedded emissions0.7226

The result

The clinker carries 95.3 per cent of the cement's embedded emissions. The importer of 50,000 tonnes declares 36,128 tonnes of CO2e. That volume is far above the 50-tonne annual de minimis threshold introduced by the 2025 simplification of CBAM, whose arithmetic is worked in is it worth staying under the CBAM 50 tonne threshold. Split by type, 0.6520 per tonne is direct and 0.0706 indirect. At an illustrative 80 euros a certificate, once free allocation has been phased out, the full exposure is 2,890,240 euros, 57.80 per tonne of cement; the certificates surrendered in the early years are reduced by the free-allocation adjustment and by any carbon price effectively paid in the country of origin. How the factor phases in is worked, for steel, in how much CBAM will cost per tonne of steel from 2026 to 2034.

What if the plant changes?

Cement SEE and declared emissions on 50,000 tonnes
VariantClinker SEECement SEEDeclared, tCO2e
Clinker ratio 0.65 (more limestone or slag)0.9060.622931,145
Base case, ratio 0.76, grid 0.700.9060.722636,128
Clinker ratio 0.900.9060.849442,470
Grid factor 0.20 (low-carbon grid)0.8660.672233,608
Grid factor 0.90 (coal-heavy grid)0.9220.742737,136

The clinker ratio dominates. Each 0.01 of ratio moves the cement figure by 0.0091, 453 tonnes on this import. The grid matters less: the plant uses 0.1008 MWh per tonne of cement through the clinker and the mills together, so each 0.10 of grid factor is worth 0.0101, about 504 tonnes. For a buyer comparing two cement suppliers, the blend is the first question and the power source the second.

The common mistakes

Takeaway

The quarterly cash profile, the certificate buffer and a blank model for your own imports are in the free workbook for this book; the same method for a steel product is worked in how to calculate CBAM embedded emissions for a steel product.

Questions readers ask

Are indirect emissions included in CBAM for cement?

Yes. Cement and fertilisers count the emissions of the electricity consumed in production, unlike iron and steel, aluminium and hydrogen, which count direct emissions only. In the worked plant the indirect part is 0.0706 of the 0.7226 tonnes per tonne of cement, 9.8 per cent, or 3,528 tonnes on a 50,000 tonne import.

How does the clinker ratio affect CBAM embedded emissions?

Almost one for one, because clinker is the precursor that carries the kiln's process and fuel emissions. In the worked plant each 0.01 of clinker ratio adds 0.0091 tonnes per tonne of cement, 453 tonnes on a 50,000 tonne import. Moving from a ratio of 0.76 to 0.65 cuts the SEE from 0.7226 to 0.6229.

What electricity emission factor is used for CBAM indirect emissions?

By default, the emission factor of the grid in the country of origin. An actual factor can be used only under the conditions set out in Annex IV of the regulation, such as a direct technical link to a generator or a qualifying power purchase agreement. In the worked plant each 0.10 of grid factor moves the cement SEE by 0.0101, about 504 tonnes on the import.

Read the whole case

This article is one calculation from The CBAM Compliance Handbook. The book takes the same case from first principles to the decision, chapter by chapter, and every figure it prints is a live formula in the free companion workbooks.

Get the book on Amazon →Free companion files

Also on Amazon UK · Amazon Germany · Amazon France · Amazon Canada

Also on this site

Reading guide: regulation, compliance and banking → · All 681 articles →

If this book helped, or didn’t, a few lines on Amazon are worth more than they look: they are what the next reader goes on. Write a review. The workbook stays free either way.