A minimum volume commitment is a take-or-pay. A make-up right turns a shortfall payment into a credit, but only if the shipper ships the excess before the credit lapses.
A shipper has committed to 100,000 barrels a day at $0.45 a barrel. Over six years it ships below the minimum twice and pays $4.11m for 25k barrels a day it did not ship. With a make-up credit that lasts only one year it recovers $0.82m, 20% of what it paid; with a two-year window it recovers $4.11m, all of it. The pipeline's revenue over the six years falls from $107.58m to $106.76m or $103.48m.
| Item | Value |
|---|---|
| Minimum volume commitment | 100,000 barrels a day |
| Tariff | $0.45 a barrel |
| Annual volume at the minimum | 16.43m a year (100,000 × 365 × $0.45) |
| Shipper volumes, years 1 to 6, thousand barrels a day | 80, 95, 125, 110, 100, 120 |
| Make-up rule | A shortfall payment earns a credit against later volume above the minimum, oldest first |
| Credit life | Tested at one, two and three years after the shortfall |
The shipper pays the tariff on the committed volume whether it ships or not. A credit lets it ship above the minimum later without paying for that excess, so the pipeline is paid once for the barrels and not twice. All volumes are annual averages.
Billed volume = the larger of actual volume and 100,000
Years 1 and 2 are short by 20k and 5k barrels a day: 25k in total
Shortfall payments = 25,000 × 365 × $0.45 = $4.11m
Excel: =MAX(Volume,Minimum)*365*Tariff
| Year | Actual volume | Shortfall (credit earned) | Excess over minimum | Credit used | Billed volume | Billed, $m |
|---|---|---|---|---|---|---|
| 1 | 80 | 20 | 0 | 0 | 100 | 16.43 |
| 2 | 95 | 5 | 0 | 0 | 100 | 16.43 |
| 3 | 125 | 0 | 25 | 5 | 120 | 19.71 |
| 4 | 110 | 0 | 10 | 0 | 110 | 18.07 |
| 5 | 100 | 0 | 0 | 0 | 100 | 16.43 |
| 6 | 120 | 0 | 20 | 0 | 120 | 19.71 |
| Total | 25 | 5 | 650 | 106.76 |
The credit earned in year 1 can only be used in year 2, where the shipper is short again, so it lapses. The credit earned in year 2 is used in year 3, when the shipper ships 25k above the minimum, and it is the only one that is recovered: 5k of 25k barrels a day. The shipper has paid $4.11m for shortfall and recovered $0.82m.
| Credit life | Credit used, thousand barrels a day | Recovered, $m | Lost to the shipper, $m | Six-year revenue, $m |
|---|---|---|---|---|
| No make-up right | 0 | 0.00 | 4.11 | 107.58 |
| One year | 5 | 0.82 | 3.29 | 106.76 |
| Two years | 25 | 4.11 | 0.00 | 103.48 |
| Three years | 25 | 4.11 | 0.00 | 103.48 |
Revenue = 107.58m (billed at the minimum or actual volume, no credits) − credits used × 365 × $0.45
One-year window: 107.58 − 0.82 = $106.76m; two-year window: 107.58 − 4.11 = $103.48m
Moving from one year to two years gives the shipper back $3.29m and takes the same amount from the pipeline. Years 4 and 6 also have excess volume (10k and 20k), but there is no credit left to use against it.
If the same six volumes arrived in a different order, with the 25k surplus in year 2 straight after the 20k shortfall in year 1 (80, 125, 95, 110, 100, 120), a one-year window would return 25k of the 25k short, and a shipper with no make-up right would get back nothing. The sequence of volumes, not their total, decides how much of the payment is returned.
A clause that turns a shortfall payment into a credit the shipper can use against later volume above the minimum, so that it does not pay twice for the same barrels. Here the credit is worth the tariff of $0.45 for each barrel a day shipped late.
Pipeline revenue is budgeted year by year, and a credit that lasted forever would turn the minimum commitment into an interest-free loan. With a one-year window, $3.29m of the $4.11m paid in this example is not returned.
They take revenue away from the pipeline when the shipper recovers the shortfall. Six-year revenue is $106.76m with a one-year window and $103.48m with a two-year window.
The free companion files for The Midstream Infrastructure Investor value a fictional fund of three midstream assets with volumes, minimum volume commitments, tariffs, debt and returns in one model. The pipeline in this article is invented and is not in them. No account and no email address.