The net position, variation margin in a rally, the borrowing base, and how to size the seasonal line, worked on a fictional November peak.
Hedging protects an elevator's earnings, not its bank account. When prices rally, the short futures lose cash every day while the grain in the bins only turns into cash when it is sold. The gap between the two is the risk that matters.
Worked in full in The Grain Elevator Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
An elevator's flat price exposure for each crop is owned grain plus fixed-price purchases minus fixed-price sales minus unpriced delayed price obligations minus net short futures. Delayed price bushels are owned, but the elevator will pay for them at its bid on the pricing date, so the open obligation cancels them until the farmer prices. At the fictional November peak in The Grain Elevator Finance Handbook, Marlow owns 5,400,000 bushels of corn, has bought 2,100,000 forward and sold 900,000 forward, carries 900,000 bushels of unpriced delayed price corn, and is short 1,080 futures contracts (5,400,000 bushels). Its net corn position is 300,000 bushels long; a one-cent move changes its value by about $3,000. The position report should show this net next to the board's limit every day, and the futures should reconcile exactly to the clearing firm's statement.
Suppose corn rallies $1.00 and soybeans $2.00. The short futures on 5,400,000 bushels of corn and 1,350,000 bushels of soybeans generate $8,100,000 of variation margin, paid in cash as the rally happens. The grain in the bins has gained about as much, so the elevator is whole on paper, but none of that gain is cash yet.
The seasonal line is a borrowing base facility. In the case, the lender advances 85.0 percent against hedged grain and 60.0 percent against unhedged grain, and reserves 25.0 percent of delayed price obligations. The rally lifts the borrowing base by $6,535,000. The remaining $1,565,000 must come from existing availability, which falls from $3,917,750 to $2,352,750.
| November peak (case) | Amount |
|---|---|
| Net borrowing base | $28,917,750 |
| Commitment / drawn | $36,000,000 / $25,000,000 |
| Availability before the rally | $3,917,750 |
| Margin calls (corn $1.00, soybeans $2.00) | $8,100,000 |
| Availability after the rally | $2,352,750 |
| Severe rally: shortfall against the commitment | $2,837,500 |
In a severe rally (corn $1.75, soybeans $3.25), margin calls reach $13,837,500 and the elevator would need $2,837,500 more than its commitment allows, while hedged and profitable. Keeping 10.0 percent of headroom in that case would take a commitment of about $43,152,778, or an equivalent mix of a seasonal increase, an accordion, and a margin sublimit. Selling grain into the rally, matching hedges to sales, using bought options for part of the hedge, and limiting delayed price volume all narrow the bridge.
The desk-level mechanics of basis and hedge accounting are worked in The Grain Merchandising Finance Handbook. For the revenue side, read how a country grain elevator makes money; to test your own line, use the free Grain Elevator Model (Excel).
Short futures that hedge owned grain lose money in a rally and are settled in cash daily, while the gain on the physical grain is realized only when it is sold.
Advance rates are applied to hedged grain, unhedged grain, receivables, and the futures account, less reserves. In the case: 85.0 percent on hedged grain, 60.0 percent on unhedged grain.
Large enough for the normal peak and a severe rally with headroom. In the case, about $43,152,778 against a current $36,000,000.
This guide is drawn from The Grain Elevator Finance Handbook, which works one fictional cooperative elevator from throughput, storage, drying, and basis through the hedge book, margin calls, and the seasonal line to a shuttle loader project, cooperative patronage, and the valuation and purchase of a second elevator.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Grain Elevator Model (Excel).