2026 50.0% Solar (64.8 percent vs. 46.3 percent) and BESS (65.6 percent vs. 34.4 percent) math plus Notice 2026-15 PFE cliffs.
In 2026, Domestic Content requires a 50.0 percent Adjusted Percentage under IRS Notice 2025-08 plus 100.0 percent U.S. structural steel, while OBBBA Prohibited Foreign Entity (PFE) rules impose a 100.0 percent credit forfeiture cliff. Here is the exact Solar and BESS math.
Worked in full in The Energy Community and Bonus Credit Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
As worked in The Energy Community and Bonus Credit Handbook, qualifying for the 10.0 percentage point Domestic Content adder in 2026 (BOC May 15, 2026 on Redstone Ridge) requires both 100.0 percent U.S.-melted structural steel and iron (backed by heat-number Mill Test Reports) and a Manufactured Products score of at least 50.0 percent (stepping up from 45.0 percent in 2025 and rising to 55.0 percent in 2027). Under IRS Notice 2025-08, foreign solar cells and foreign battery cells both fail the 2026 threshold:
| Asset & Notice 2025-08 Table | Domestic Cells Strategy (PASS) | Foreign Cells Strategy (FAIL) | 2026 Floor |
|---|---|---|---|
| Solar Ground-Mount Tracking (Sec. 5.05) | 64.8 percent (+14.8 percent) | 46.3 percent (-3.7 percent) | 50.0 percent |
| Grid-Scale BESS >1 MWh (Sec. 7.02) | 65.6 percent (+15.6 percent) | 34.4 percent (-15.6 percent) | 50.0 percent |
Spending $16,500,000 in incremental domestic equipment premiums ($10,500,000 solar plus $6,000,000 BESS) lifts Redstone Ridge's gross Section 48E ITC from $101,400,000 (40.0 percent on $253,500,000) to $135,000,000 (50.0 percent on $270,000,000), a gross ITC lift of $33,600,000 (a 2.04x gross CapEx multiple) that adds 302 bps to sponsor levered IRR even after tiered Section 6418 pricing ($0.895 on DC) and 3.0 percent tax credit insurance ($4,050,000).
Effective for projects beginning construction on or after January 1, 2026, the One Big Beautiful Bill Act (P.L. 119-21) enforces an all-or-nothing Material Assistance Cost Ratio (MACR) gate: 40.0 percent non-PFE direct costs for generation and 55.0 percent for energy storage. Under IRS Notice 2026-15, developers may leverage Notice 2025-08 tables to document MACR. On Redstone Ridge, Solar clears at 62.0 percent (+22.0 percent) and BESS clears at 68.0 percent (+13.0 percent), whereas a foreign-influenced battery cell swap dropping BESS MACR to 48.0 percent forfeits 100.0 percent of the $45,000,000 BESS credit. Meanwhile, under Section 6418(g)(2), disallowing a 10.0 percent DC adder exposes the buyer to $32,400,000 ($27,000,000 clawback plus $5,400,000 20.0 percent penalty).
Review Energy Community GIS rules in Energy Community bonus credit qualification and GIS audit guide, explore Section 48E(h) low-income stacking in Section 48E(h) Low-Income Communities bonus credit stacking, and run your own Notice 2025-08 and MACR screen in the free Energy Community and Bonus Credit Stack Model (Excel).
Under IRS Notice 2025-08 Section 5.05, pairing U.S. module frames, glass, encapsulant, and backsheet (19.6 percent) with a 100.0 percent U.S. tracker (26.7 percent) reaches only 46.3 percent when cells are foreign, falling 3.7 points short of the 50.0 percent 2026 threshold unless domestic inverters or additional domestic module MPCs are added.
Domestic Content is an optional +10.0 percentage point bonus credit; missing it leaves the base credit and Energy Community adder intact. OBBBA PFE MACR (40.0 percent generation and 55.0 percent BESS in 2026) is an all-or-nothing disqualification cliff that forfeits 100.0 percent of the entire Section 45Y or 48E tax credit if breached.
Under Notice 2025-08, an Applicable Project Component's Production subtotal (8.0 percent for BESS Battery Pack Production) can be counted only if 100.0 percent of that APC's underlying Manufactured Product Components (both Cells and Packaging) are manufactured in the United States.
This guide is drawn from The Energy Community and Bonus Credit Handbook, following utility-scale solar, BESS, community solar, and tax-exempt projects from Beginning of Construction and Energy Community siting through Notice 2025-08, OBBBA PFE/MACR, Section 48E(h), and Section 6418 transfers.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Energy Community and Bonus Credit Stack Model (Excel).