Every covered federal construction week requires a certified payroll record proving each worker’s classification, hours, basic rate, fringe credit and cash in lieu, backed by a signed Statement of Compliance.
Under 29 CFR 5.5(a)(3) and the Copeland Act (40 U.S.C. 3145), contractors on Davis-Bacon projects over $2,000 must submit weekly certified payrolls accompanied by a signed Statement of Compliance and retain supporting records for 3 years after prime contract completion. On Brennock Mechanical’s worked 46-hour week, one plumber earns $2,263.28 gross ($1,955.00 straight time, $127.50 overtime premium, $180.78 cash in lieu) alongside $732.32 of annualized plan credit.
Worked in full in The Davis-Bacon Handbook by Julian R. Sterling.Get the DRM-free PDF, $19.99 →or the ebook and paperback
Free: the Davis-Bacon fringe calculator in Excel, computing the annualized plan credit, cash in lieu and divisor-error shortfall before you sign weekly certified payroll.
The Copeland Anti-Kickback Act (40 U.S.C. 3145) and 29 CFR 5.5(a)(3) require every prime contractor and lower-tier subcontractor on a covered federal or federally assisted construction contract in excess of $2,000 to file a weekly certified payroll report. Optional Form WH-347 from the U.S. Department of Labor Wage and Hour Division provides the standard template; payroll-software exports are acceptable as long as every required data element and the exact Statement of Compliance wording are included.
Each weekly submission must document:
Records (including basic timecards, fringe plan cost records, apprenticeship certificates and regular payrolls) must be preserved for 3 years after all work on the prime contract is completed, not merely 3 years after a subcontractor leaves the job.
Brennock Mechanical, Inc. is the fictional open-shop plumbing and HVAC subcontractor in The Davis-Bacon Handbook, working on the renovation of the Fenwick Federal Building. Under the illustrative building wage determination, a journeyman plumber and pipefitter requires $42.50 basic plus $19.85 fringe ($62.35 package). Brennock’s annualized fringe plan credit for an enrolled plumber is $15.92 per hour ($9.12 health, $2.45 vacation and holidays, $4.00 401(k) exception, $0.35 training), leaving $3.93 per hour to be paid as cash in lieu on every Davis-Bacon hour.
In the week ending 16 October 2026, plumber P-07 works 46 hours on the federal site (40 straight time, 6 overtime). Here is every number that must tie out on WH-347:
| Payroll line | Formula | Amount ($) |
|---|---|---|
| Straight-time basic wages (all 46 hours) | 46 hrs × $42.50 | 1,955.00 |
| Overtime half-time premium (6 OT hours) | 6 hrs × ($42.50 × 0.5) | 127.50 |
| Cash in lieu of fringe (all 46 hours) | 46 hrs × $3.93 | 180.78 |
| Gross cash pay reported on WH-347 | $1,955.00 + $127.50 + $180.78 | 2,263.28 |
| Bona fide fringe plan credit (box 4(a)) | 46 hrs × $15.92 | 732.32 |
| Total fringe obligation satisfied | $732.32 plan + $180.78 cash = 46 × $19.85 | 913.10 |
Notice two critical rules that reviewers check immediately. First, the cash in lieu ($3.93) is paid on all 46 hours, including overtime hours, because the fringe obligation applies to every hour worked. Second, the overtime half-time premium ($21.25) is computed on the basic hourly rate ($42.50), not on the combined cash rate of $46.43; multiplying 6 overtime hours by half of $46.43 would overpay by $11.79 on that single week.
1. Classification proof: daily timecards match the work actually performed on site, hour by hour.
2. Fringe box check: annualized credit is divided by all hours worked (private plus Davis-Bacon), never Davis-Bacon hours alone.
3. Apprentice documentation: registration certificate attached to the first payroll and daily ratio checked against journeyworkers on site.
4. Subcontractor flow-down: every lower-tier sub’s signed WH-347 collected before releasing progress payments.
Two of the fastest ways to trigger back wages on a certified payroll audit are undocumented split-classification weeks and unmonitored apprentice ratios:
| Payroll scenario | Documented / compliant ($) | Non-compliant exposure ($) | Extra cost ($) |
|---|---|---|---|
| Split week: 32 hrs pipefitting ($46.43) + 8 hrs laborer ($24.40) | 1,680.96 | 1,857.20 (40 hrs × $46.43) | 176.24 |
| 3rd-year plumber apprentice (60% = $25.50 + $19.85 fringe), 240 over-ratio hrs | 10,884.00 | 14,964.00 (paid at $42.50 + $19.85) | 4,080.00 |
In the split week, paying 32 hours at the plumber cash rate ($46.43) and 8 hours at the laborer rate ($24.40) totals $1,485.76 + $195.20 = $1,680.96. If the foreman’s daily sheet fails to separate the 8 laborer hours, enforcement rules require all 40 hours to be paid at the higher pipefitting rate ($1,857.20), adding $176.24 for one worker in one week.
For apprentices, a registered third-year plumber apprentice at 60 percent receives $25.50 basic plus the full $19.85 fringe (when the program is silent on fringe) only when the daily jobsite ratio (1 apprentice to 3 journeyworkers in the case) is respected. Working 240 hours above the ratio requires stepping the apprentice up by $17.00 per hour ($42.50 minus $25.50), creating $4,080.00 in back wages.
The trap: signing the Statement of Compliance while dividing annual health and vacation costs by Davis-Bacon hours only, or ignoring a second-tier subcontractor’s payrolls. In Brennock’s 26-week self-audit, those errors accumulate to $58,460.50 in back wages plus $594 in CWHSSA liquidated damages ($33 per worker per calendar day on contracts over $100,000), and willful falsification exposes a contractor to contract withholding, cross-withholding and 3-year debarment.
Treat weekly Davis-Bacon certified payroll as an audit file, not a clerical form: tie every WH-347 line to daily split-class timecards, annualized fringe worksheets, apprentice ratio logs and lower-tier subcontractor submissions before anyone signs the Statement of Compliance.
Figures checked on 23 November 2026. Federal rules as read in November 2026; Brennock Mechanical, Inc. and its wage determination are fictional teaching assumptions, not published prevailing rates. Not legal, payroll, tax or benefits advice.
Using the physical Form WH-347 layout is optional; contractors may submit payroll-software reports that contain all required fields. However, weekly certified payroll reporting and the signed Statement of Compliance are mandatory under 29 CFR 5.5(a)(3) and the Copeland Act (40 U.S.C. 3145).
Under 29 CFR 5.5(a)(3), contractors and subcontractors must maintain payroll and basic supporting records for at least 3 years after all the work on the prime contract is completed, not merely 3 years after their own subcontract finishes.
If daily time records do not segregate hours by the work actually performed, the contractor must pay all hours at the highest applicable classification rate. In the worked case, 32 hours of pipefitting and 8 hours of laborer work cost $1,680.96 documented, versus $1,857.20 undocumented, a $176.24 penalty.
Yes. Under Davis-Bacon flow-down rules, the prime contractor is responsible for compliance by every lower-tier subcontractor, and the contracting agency can withhold or cross-withhold contract funds to cover unpaid back wages and CWHSSA liquidated damages ($33 per worker per calendar day).
This article is one chapter from The Davis-Bacon Handbook, a practitioner’s guide to federal prevailing wage compliance: wage determinations, fringe credit and annualization, certified payroll, apprentices, overtime, flow-down, self-audits and bid pricing, with three free Excel workbooks.