Kiln run days, the clinker factor, variable cost per ton, netbacks by channel, the cost of downtime, and normalized EBITDA.
A cement plant runs on one very expensive kiln, sells a heavy product whose freight decides its market, and carries mostly fixed costs. Here is how the money works, on a fictional plant, line by line.
Worked in full in The Cement Plant Finance Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
A cement plant quarries limestone, grinds it with smaller amounts of clay, sand, and iron-bearing material, and heats it in a rotating kiln until it forms clinker. Clinker is then ground with gypsum, and often with extra limestone, into cement. Every part of that chain can be sized with spare capacity except the kiln. When the kiln runs, the plant earns money. When it stops, fixed costs keep arriving. The figures below come from Harrow Point Cement, a fictional plant worked in full in The Cement Plant Finance Handbook. Every price and cost is an assumption chosen to make the arithmetic visible, not a market quote.
Harrow Point's kiln is rated at 3,200 tons of clinker a day. After 21 days of planned outage and 14 days of unplanned stops, it runs 330 days and makes 1,056,000 tons of clinker. Because most of its sales are portland-limestone cement, each ton of cement contains on average 0.850 tons of clinker, so the clinker becomes 1,242,353 tons of cement. That ratio, the clinker factor, is the exchange rate between the kiln and the market. A twin plant selling only portland cement, with a factor of 0.920, would make 94,527 fewer tons from the same kiln.
| Per ton of cement, base year | Amount |
|---|---|
| Average price at point of sale | $147.00 |
| Freight and handling | $13.30 |
| Production variable cost | $30.35 |
| Contribution | $103.35 |
| Fixed costs | $52.16 |
| EBITDA | $51.19 |
Fictional case figures computed by the book's deterministic model.
Clinker is the costly ingredient: it costs $21.25 per ton of clinker in variable cost, or $18.06 inside each ton of cement. Fuel and electricity together are 55% of production variable cost. Fixed costs, $64,800,000 a year, are 54% of all cash costs. Base-year EBITDA is $63,599,351, a margin of 34.8%.
Harrow Point sells at its gate, through an owned rail terminal, and through a leased river terminal. After freight and handling, the river terminal nets back the least, $124 a ton, so it is the channel that gains or loses tons when output changes. In a sold-out year, one more day of unplanned downtime removes about 3,765 tons of cement and costs about $352,571 of EBITDA. In a soft year, when the kiln already has idle days, the same stop costs almost nothing beyond the repair. Reliability is worth most exactly when the market is strong.
Cement demand follows construction. In the book's five market states, EBITDA ranges from $19,522,016 in a trough to $81,861,939 at a peak. Normalized EBITDA, the probability-weighted average, is $58,773,555, below the base year, because a sold-out plant gains only price in good years and loses both price and volume in bad ones. In the trough, revenue falls 29% and EBITDA falls 69%.
In any coastal or river market, the landed cost of imported cement sets a ceiling. In the case, imported cement costs $78 a ton at the export port; ocean freight, insurance, port handling, and inland delivery bring it to $135 without any duty. The river terminal sells $15 above that, which invites competition. If the plant had to match parity, it would lose $3,727,059 of EBITDA, yet the terminal would still earn $78.65 a ton over production variable cost. An established plant can defend a market down to its variable cost, which is why imports usually compress margins rather than end domestic sales.
The free Cement Plant Model (Excel) rebuilds the kiln, the product mix, the channels, energy, the same five market states as the book, normalized EBITDA, the borrowing base, and coverage from your own inputs. For the carbon side, read what decarbonizing a cement plant costs. For lenders and buyers, read how to value a cement plant. Energy buyers may also find The Commercial Energy Procurement Handbook useful.
The share of clinker in a ton of finished cement. In the book's fictional case it is 0.850. A lower factor means less fuel and carbon dioxide per ton and, in a sold-out plant, more cement from the same kiln.
Because when the kiln loses output, the plant cuts the sales that net back the least first. Valuing lost tons at the average contribution overstates or understates the loss.
No. It illustrates methods with fictional figures. Real prices and costs come from a plant's own records and contracts.
This guide is drawn from The Cement Plant Finance Handbook, which follows a fictional cement plant from the quarry face through the kiln, the clinker factor, energy, terminals, air and carbon rules, market states, adjustments, working capital, debt, an investment, and value.
Paperback, $32.99 PDF edition, $19.99 Book page and companion workbooks
Free download: Cement Plant Model (Excel).