Full unit amounts for components sold through 2029, then 75, 50 and 25 percent, and zero after 2032; wind, metallurgical coal and critical minerals follow their own dates.
Section 45X pays full unit amounts for components sold through 2029, then 75 percent in 2030, 50 percent in 2031, 25 percent in 2032 and nothing after 2032. Wind components end after 2027, metallurgical coal after 2029 production, and critical minerals phase out by year of production from 2031 to 2033.
Worked in full in The Section 45X Handbook by Julian R. Sterling, with every figure reproduced in live Excel workbooks.Get the DRM-free PDF, $19.99 →
Under section 45X(b)(3), the amount for an eligible component is reduced according to the year in which it is sold. The last column applies the calendar to the worked case below at constant 2026 volumes and rules, as an illustration only.
| Year of sale | Share of the unit amount | Ashby Ridge at 2026 volumes |
|---|---|---|
| Through 2029 | 100 percent | $256,120,000 a year |
| 2030 | 75 percent | $192,090,000 |
| 2031 | 50 percent | $128,060,000 |
| 2032 | 25 percent | $64,030,000 |
| 2033 and later | zero | $0 |
P.L. 119-21 did not accelerate this calendar and did not change the unit amounts, other than by adding metallurgical coal. Because the test is the year of sale, a module produced in 2029 and sold in 2030 earns 75 percent of its amount, which makes year-end inventory a planning item from 2029 on.
The unit amounts stay flat until 2030, but the material assistance threshold rises every year. For solar components it goes from 50 percent in 2026 to 60 percent in 2027, 70 percent in 2028, 80 percent in 2029 and 85 percent after 2029; for battery components from 60 percent to 85 percent over the same years; for critical minerals from 0 percent through 2029 to 50 percent after 2032. A component whose cost ratio fails loses its whole unit amount, years before the phase-out would have cut a quarter of it. The mechanics are in the 45X FEOC and material assistance rules.
The worked case makes the point. Ashby Ridge Energy Manufacturing, Inc. is a fictional manufacturer of solar cells and modules, battery cells and modules and tracker parts, and every company, person and amount is invented for illustration. It earns $256,120,000 in 2026 (computed in how to calculate the section 45X credit). On its current bills of materials the rising thresholds would bite well before the phase-out: its Ohio cells, at 53.3 percent, would fail the 60 percent threshold of 2027, and its Georgia cells, at 67.5 percent, the 70 percent threshold of 2028.
For components sold in tax years beginning after December 31, 2026, a primary component built into a secondary component is treated as sold to an unrelated person only if the secondary component is produced in the same manufacturing facility and at least 65 percent of its direct material costs are attributable to primary components mined, produced or manufactured in the United States. No guidance on "same manufacturing facility" or on how to measure the 65 percent had been published by November 2026, and whether only eligible components or every US-origin input counts is an open reading.
| Modules, 2027 test | Eligible components only | Every US-origin input |
|---|---|---|
| Ohio, 2026 bill of materials | 63.2 percent | 63.2 percent: fails |
| Ohio, 2027 sourcing plan | 66.5 percent | 79.2 percent |
| Georgia | 81.2 percent | 87.5 percent |
On the 2026 bill of materials only the cells, $0.120 of $0.190 per module watt, are US-origin, so the Ohio modules would fail on either reading and the 1,000 MW of cells inside them would earn no credit in 2027. With US-made glass and backsheet in the plan, they would pass on both readings, narrowly on the first.
| Scenario, 2027 | Amount |
|---|---|
| Credit if nothing changes in Ohio | $212,120,000 |
| Credit with the sourcing plan | $256,120,000 |
| Cell credits at stake ($4,000,000 direct, $40,000,000 integrated) | $44,000,000 |
| Extra cost of the plan ($3,300,000 wafers, $3,920,000 glass and backsheet) | $7,220,000 |
| Net gain of the plan | $36,780,000 |
The plan costs a wafer premium of $0.003 per cell watt on 1,100 MW and a glass and backsheet premium of $0.004 per module watt on 980 MW. Against $44,000,000 of credits at stake, the choice is not close, and it is a 2026 decision: the sourcing has to be in place before the first 2027 sale.
The trap: inventory crossing a year end. The 49 MW of modules Ashby Ridge held at the end of 2026 would be sold in 2027 under the 2027 rules. On the statutory reading, their $2,000,000 of cell credit would be lost, because cells with 2026 wafers fail the 2027 ratio and the 2026 bill of materials fails the 65 percent test; the modules' own $3,430,000 would remain. How the rules apply to that inventory is not settled, so it should be modeled both ways.
Three habits help. Model each component by year of sale, not of production, against both the phase-out percentage and the material assistance threshold of that year. Write supply and customer contracts with the credit in mind: price adjustment clauses tied to the credit, supplier certifications, and sourcing commitments that track the rising thresholds. And keep scenarios apart: a constant-volume projection like the one above is an illustration, not a forecast, and each year's plan should be rerun when guidance changes.
The free Section 45X Credit Calculator applies the phase-out by year, the material assistance threshold of the year and the 65 percent test to up to 15 component lines, so the cliffs show up line by line. The multi-year plan, the 2027 projection and the documentation behind them are worked in The Section 45X Handbook.
For components sold in 2030 the credit is 75 percent of the unit amount, in 2031 50 percent, in 2032 25 percent, and after December 31, 2032 nothing. Components sold through 2029 earn the full amount.
Wind energy components produced and sold after December 31, 2027 earn no credit, a cutoff added by P.L. 119-21. Until then they also face material assistance thresholds of 85 percent in 2026 and 90 percent in 2027.
Since P.L. 119-21, yes, by year of production rather than year of sale: 75 percent for minerals produced in 2031, 50 percent in 2032, 25 percent in 2033 and zero after 2033. Metallurgical coal earns 2.5 percent of production costs only for coal produced through 2029.
No. P.L. 119-21 kept the 2030 to 2032 calendar for most components and did not change the unit amounts, apart from adding metallurgical coal. It added the wind cutoff, a phase-out for critical minerals, the material assistance rules and the 2027 integrated components test.
Rules and figures checked on 22 November 2026.
This guide is one arc of The Section 45X Handbook. The book follows one manufacturer with solar, battery and tracker plants through its first year under the prohibited foreign entity rules: eligible components and unit amounts, production and contract manufacturing, the related-party election, integrated components before and after 2027, the phase-out, prohibited foreign entities and the material assistance cost ratio, transfer and direct payment, accounting, Form 7207 and examination.
Paperback PDF edition, $19.99 Book page and companion workbooks
Free download: Section 45X Credit Calculator (Excel).
Illustrative figures computed by the book model; Ashby Ridge Energy Manufacturing, Inc. and every company, person and amount are fictional and invented for illustration. Rules described as read in November 2026; proposed regulations, new safe harbor tables and interpretations may change them. Education only, not tax, legal or investment advice.