# The Wastewater Treatment Project Finance Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/wastewater-project-finance/

1. **Cedar_Creek_Wastewater_Case_Workbook.xlsx**: Complete 8-tab Excel case model reproducing Cedar Creek Water Reclamation Facility ($240,000,000, 30.0 MGD ADF, Stack A All-Muni vs. Stack B Blended WIFIA-CWSRF-Title XVI-Sec. 6417 saving $44,441,029 PV, PFAS biosolids shock, Stack C DBFOM P3 VfM $53,968,725 & GASB 94 $286,602,981) and Mesa Verde BOO Industrial Reuse ($66,000,000, 1.74x base / 1.15x floor DSCR, 21.1 percent levered IRR), with dynamic Controls = 0.
2. **Wastewater_Project_Finance_and_SRF_Model.xlsx**: Standalone 6-tab Wastewater Project Finance and SRF Model with a 3-scenario selector (Base, PFAS/Rate Stress, Upside Grant/EC), WIFIA 49%/80% cap tests, IRC 148(d) 3-prong DSRF, VfM & GASB 94 calculator, 3x3 stress matrix, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, engineering, municipal advisory, tax, or investment advice.
