Renewable_Energy_Development_Model_Blank.xlsx: the book's inputs, cell by cell (Cedar Hollow Solar)
Type each value into the named sheet and cell. Shares are decimals (0.05 = 5%). Units as the label says.

Inputs!C10	150	Capacity (MWac)
Inputs!C11	195	Modules (MWdc)
Inputs!C13	0.26	Net AC capacity factor, P50, year one
Inputs!C14	0.004	Module degradation a year
Inputs!C17	0.05	Interannual variability (one year)
Inputs!C18	0.04	Long-term resource estimate
Inputs!C19	0.035	Energy model and loss assumptions
Inputs!C23	10	Averaging period of the multi-year exceedance levels (years)
Inputs!C26	0.02	Soiling and snow
Inputs!C27	0.015	Near shading and row-to-row shading
Inputs!C28	0.06	Temperature
Inputs!C29	0.025	Module quality, mismatch and DC wiring
Inputs!C30	0.02	Inverter efficiency
Inputs!C31	0.015	Clipping at the 1.30 loading ratio
Inputs!C32	0.015	AC wiring, transformers and gen-tie
Inputs!C33	0.01	Availability
Inputs!C36	1250	Acres optioned in 2022
Inputs!C37	1050	Acres finally leased
Inputs!C38	40	Option payment during development ($ per acre-year)
Inputs!C39	1000	Lease rent from 2028 ($ per acre-year)
Inputs!C40	0.02	Rent escalation a year
Inputs!C41	35	Operating term of the lease (years)
Inputs!C42	2	Number of extensions
Inputs!C43	5	Length of each extension (years)
Inputs!C46	0.3	Modules ($/Wdc, owner-furnished)
Inputs!C47	0.14	Trackers and racking ($/Wdc)
Inputs!C48	0.06	Inverters and medium-voltage skids ($/Wac)
Inputs!C49	0.4	Electrical balance of system, civil works, installation ($/Wdc)
Inputs!C50	12000000	Project substation and 6-mile 230 kV gen-tie ($)
Inputs!C51	0.05	Contingency on modules plus EPC scope
Inputs!C52	18000000	Network upgrades assigned in the facilities study ($)
Inputs!C53	9000000	Owner's costs during construction ($)
Inputs!C54	0.04	Net decommissioning after salvage ($/Wdc, 2027 dollars)
Inputs!C55	0.35	Gen-tie share of the substation line, excluded from the ITC basis
Inputs!C58	300000	Development spend on 1 January 2022
Inputs!C59	900000	Development spend on 1 January 2023
Inputs!C60	1800000	Development spend on 1 January 2024
Inputs!C61	2600000	Development spend on 1 January 2025
Inputs!C62	3400000	Development spend on 1 January 2026
Inputs!C63	3600000	Interconnection security posted at the LGIA (reimbursed at NTP)
Inputs!C64	4500000	Physical work of June 2026 (reimbursed at NTP)
Inputs!C67	27000000	Development premium paid at NTP ($)
Inputs!C68	0.15	Discount rate for development-stage cash flows
Inputs!C69	150000	Cluster study deposit ($)
Inputs!C70	2	Initial readiness deposit, multiple of the study deposit
Inputs!C71	0.05	Readiness deposit at the restudy (share of network upgrades)
Inputs!C72	0.1	Readiness deposit at the facilities study (share)
Inputs!C73	0.2	Security at the LGIA (share)
Inputs!C76	0.2	Site control: land options signed, first screening done
Inputs!C77	0.3	Interconnection request filed in a cluster, studies under way
Inputs!C78	0.45	Cluster study results received; environmental studies done; permit application filed
Inputs!C79	0.65	Conditional use permit granted; facilities study under way
Inputs!C80	0.8	Interconnection agreement signed; PPA under negotiation
Inputs!C81	0.92	PPA signed and construction begun (physical work, June 2026)
Inputs!C82	1	Notice to proceed: permits, interconnection, PPA, EPC and supply contracts in hand
Inputs!C85	1800	Pipeline at the 2022 stage (MWac)
Inputs!C86	900	Pipeline at the 2023 stage (MWac)
Inputs!C87	600	Pipeline at the 2024 stage (MWac)
Inputs!C88	450	Pipeline at the 2025 stage (MWac)
Inputs!C89	300	Pipeline at the 2026 stage (MWac)
Inputs!C90	150	Pipeline at the 2027 stage (MWac)
Inputs!C93	2000000	Milestone sale on 1 January 2025: cash at signing ($)
Inputs!C94	3000000	Payment at the LGIA, if reached ($)
Inputs!C95	5000000	Payment at NTP, if reached ($)
Inputs!C97	2038	Later sale date for the operating project: 1 January of
Inputs!C99	1	Length of the slip (years)
Inputs!C102	9	O&M contract ($/kWac-year)
Inputs!C103	350000	Asset management ($)
Inputs!C104	0.003	Insurance (share of capital cost)
Inputs!C105	1100000	Payment in lieu of taxes ($)
Inputs!C106	250000	Station power, telecoms, interconnection operation ($)
Inputs!C107	0.025	Operating cost escalation a year
Inputs!C110	50	Hub around-the-clock price ($/MWh)
Inputs!C111	0.025	Hub price escalation a year
Inputs!C112	0.9	Solar capture rate in 2028
Inputs!C113	0.008	Capture rate loss a year (points)
Inputs!C114	0.8	Capture rate floor
Inputs!C115	-2.5	Node minus hub basis in solar hours ($/MWh, escalates with the hub)
Inputs!C116	3	Merchant RECs ($/MWh, flat)
Inputs!C117	120	Capacity price ($/MW-day, flat)
Inputs!C119	0.3	Solar accreditation in 2028 (share of MWac)
Inputs!C120	0.015	Accreditation loss a year (points)
Inputs!C121	0.12	Accreditation floor
Inputs!C124	57	Utility PPA price in 2028 ($/MWh, bundled, at the node)
Inputs!C125	0.02	Utility PPA escalation a year
Inputs!C126	20	Utility PPA term (years)
Inputs!C127	63	Corporate virtual PPA price ($/MWh, flat, settled at the hub)
Inputs!C128	15	Virtual PPA term (years)
Inputs!C132	2.057	Inflation adjustment factor in the reference year
Inputs!C134	0.025	Growth of the factor a year (case assumption)
Inputs!C138	0.3	ITC rate
Inputs!C139	0.1	Energy community bonus (PTC share or ITC points)
Inputs!C140	0.1	Domestic content bonus
Inputs!C141	0.93	Transfer price per dollar of ITC
Inputs!C142	0.925	Transfer price per dollar of PTC
Inputs!C145	0.07	Contracted revenue, credit cash and all costs
Inputs!C146	0.095	Merchant revenue
Inputs!C149	0.0625	Term debt interest rate
Inputs!C150	1.3	Coverage ratio on CFADS at P50, contracted cases
Inputs!C151	1	Coverage ratio on CFADS at P99 one-year, contracted cases
Inputs!C152	2	Coverage ratio, merchant case (P50)
Inputs!C153	18	Tenor, case U (years)
Inputs!C154	13	Tenor, case C (years)
Inputs!C155	7	Tenor, case M (years)
Inputs!C156	0.07	Construction loan rate
Inputs!C157	0.5	Average construction loan balance (share of the capital cost)
Inputs!C160	0.075	Investor's after-tax target yield
Inputs!C161	0.99	Allocation of income, loss and PTC before the flip
Inputs!C162	0.1	Share of cash before the flip
Inputs!C163	0.05	Share of everything after the flip
Inputs!C164	10	Flip year (years after COD)
Inputs!C165	0.21	Federal income tax rate
Inputs!C174	0.26	Cedar Hollow
Inputs!C175	0.268	Bram Creek
Inputs!C176	0.248	Oxley Flats
Inputs!C177	500000	Gen-tie cost per mile ($)
Inputs!C178	6	Gen-tie miles included in the substation line of Cedar Hollow
Inputs!C181	150	Wind: Capacity (MW)
Inputs!C182	25	Wind: Turbines
Inputs!C183	6	Wind: Turbine size (MW)
Inputs!C184	0.36	Wind: Net capacity factor, P50
Inputs!C185	30	Wind: Life (years)
Inputs!C186	0.06	Wind: Interannual variability
Inputs!C187	0.05	Wind: Long-term resource
Inputs!C188	0.06	Wind: Model: wakes, power curve, losses
Inputs!C189	1250	Wind: Turbines ($/kW)
Inputs!C190	560	Wind: Balance of plant ($/kW)
Inputs!C191	11000000	Wind: Substation ($)
Inputs!C192	0.05	Wind: Contingency
Inputs!C193	22000000	Wind: Network upgrades ($)
Inputs!C194	10000000	Wind: Owner's costs ($)
Inputs!C195	40	Wind: Net decommissioning ($/kW, 2027 dollars)
Inputs!C196	45	Wind: All-in operating cost ($/kW-year, 2028)
Inputs!C197	0.93	Wind: Capture rate in 2028
Inputs!C198	0.005	Wind: Capture rate loss a year
Inputs!C199	0.85	Wind: Capture rate floor
Inputs!C200	-3	Wind: Basis ($/MWh, 2028)
Inputs!C201	0.15	Wind: Accreditation (share of MW)
Inputs!C202	60	Wind: Utility PPA price ($/MWh, 2028)
Inputs!C203	0.02	Wind: Utility PPA escalation
Inputs!C204	20	Wind: Utility PPA term (years)
Inputs!C207	75	Battery: Power (MW)
Inputs!C208	300	Battery: Energy (MWh)
Inputs!C209	240	Battery: Capital cost ($/kWh)
Inputs!C210	0.3	Battery: Storage ITC rate
Inputs!C211	0.93	Battery: Transfer price
Inputs!C212	300	Battery: Cycles a year
Inputs!C213	0.97	Battery: Availability
Inputs!C214	0.86	Battery: Round-trip efficiency
Inputs!C215	72	Battery: Evening price, 2028 ($/MWh)
Inputs!C216	26	Battery: Midday charging price, 2028 ($/MWh)
Inputs!C217	0.025	Battery: Price escalation
Inputs!C218	0.02	Battery: Real decline of the evening price a year
Inputs!C219	0.8	Battery: Capacity accreditation
Inputs!C220	12	Battery: Operating cost ($/kW-year, 2028)
Inputs!C221	0.02	Battery: Usable energy loss a year
Inputs!C222	20	Battery: Life (years)
Inputs!C223	4000	Battery: Clipped DC energy recovered (MWh a year)
Inputs!C224	10	Battery: capacity contract term (years)
Inputs!C225	7	Battery: capacity contract, low ($/kW-month)
Inputs!C226	8	Battery: capacity contract, central ($/kW-month)
Inputs!C227	9	Battery: capacity contract, high ($/kW-month)
Inputs!C230	0.22	Solar cells
Inputs!C231	0.28	Module assembly, glass, frames and backsheet
Inputs!C232	0.22	Trackers
Inputs!C233	0.12	Inverters
Inputs!C234	0.16	Transformers, switchgear and cabling
Inputs!C243	350	Delay liquidated damages ($ per MWac per day)
Inputs!C244	0.15	Cap on delay damages (share of the EPC price)
Inputs!C245	0.05	Retention on progress payments
Inputs!C246	0.97	Performance guarantee: tested capacity at least
Inputs!C248	1	Delay tested (months), short
Inputs!C249	3	Delay tested (months), medium
Inputs!C250	6	Delay tested (months), long
Inputs!C298	1200000	Land: options, title, surveys
Inputs!C299	2400000	Environmental studies and permitting
Inputs!C300	1400000	Interconnection studies and deposits (excluding the LGIA security)
Inputs!C301	1500000	Resource assessment and engineering
Inputs!C302	1400000	Legal, offtake and commercial
Inputs!C303	1100000	Team and overhead allocated
Inputs!D174	6	Cedar Hollow
Inputs!D175	14	Bram Creek
Inputs!D176	2	Oxley Flats
Inputs!E174	18000000	Cedar Hollow
Inputs!E175	41000000	Bram Creek
Inputs!E176	9000000	Oxley Flats
Inputs!F174	1000	Cedar Hollow
Inputs!F175	850	Bram Creek
Inputs!F176	1300	Oxley Flats
Inputs!G174	0	Cedar Hollow
Inputs!G175	1	Bram Creek
Inputs!G176	0	Oxley Flats
Inputs!D230	1	Solar cells
Inputs!D231	0	Module assembly, glass, frames and backsheet
Inputs!D232	0	Trackers
Inputs!D233	0	Inverters
Inputs!D234	0	Transformers, switchgear and cabling
Inputs!E230	1	Solar cells
Inputs!E231	1	Module assembly, glass, frames and backsheet
Inputs!E232	0	Trackers
Inputs!E233	1	Inverters
Inputs!E234	0	Transformers, switchgear and cabling
Inputs!F230	1	Solar cells
Inputs!F231	1	Module assembly, glass, frames and backsheet
Inputs!F232	0	Trackers
Inputs!F233	0	Inverters
Inputs!F234	0	Transformers, switchgear and cabling