# The Public Power Revenue Bond Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/public-power-bonds/

1. **Public_Power_Revenue_Bond_Case_Workbook.xlsx**: Complete 7-tab Excel case model reproducing every calculation of the Riverbend Municipal Electric Authority (RMEA) and Mid-Valley Municipal Power Agency (MVMPA) case (retail sales by class, power supply stack, five-level DSCR to Net FCC bridge, DCOH and Total Liquidity, +45% energy price and 30-day outage stress test, 25% JAA step-up, Series 2026A bond sizing, ABT, IRC 148(d) DSRF, IRC 6417 Elective Pay, IRC 141 PBU caps, and dynamic Controls = 0).
2. **Public_Power_Credit_Model_Template.xlsx**: Standalone 5-tab practitioner template with Scenario Selector (Base, Unmitigated Stress, Mitigated Stress, JAA Step-Up), two-way sensitivity matrix, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, municipal advisory, tax, accounting, or investment advice.
