# The Preventive Maintenance and Spare Parts Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/preventive-maintenance/

1. **Preventive_Maintenance_Workbook.xlsx**: Complete live Excel model reproducing every calculation of the Kestrel Precision Manufacturing, Inc. case (400 assets & $60M RAV criticality, MTBF/MTTR/Availability, wrench time & ready backlog, VED storeroom, Poisson critical spares, EOQ/ROP, 1,440-hr Downtime Pareto, zero-based maintenance budget, 3-scenario CFO NPV, and dynamic Controls tab = 0).
2. **PM_Spare_Parts_Calculator.xlsx**: Standalone practitioner calculator prefilled with Example Co. Overwrite blue input cells to size your own MTBF/MTTR, PM labor load, ready backlog, Poisson critical spares, and EOQ/ROP.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not engineering, safety, accounting, or tax advice.
