# The P3 Bid Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/p3-bid/

1. **Appalachian_Mobility_P3_Bid_Workbook.xlsx**: Complete 8-tab Excel case workbook reproducing every calculation of Appalachian Mobility Partners, LLC pursuing PDOT's $850.0 million Blue Ridge Mobility Corridor P3 (phase-by-phase bid budget, Gate 1 & Gate 2 Expected Value, ATCs 1-3 valuation, $850M Sources & Uses, 30-year BCFM, 70/30 Best-Value scoring, 120-day Financial Close rate/spread sharing, TIFIA 33% vs. 49%, protest and deduction stress tests, and dynamic Controls = 0).
2. **P3_Bid_Cost_and_Go_No_Go_Model.xlsx**: Standalone 6-tab P3 Bid Cost & Go/No-Go Expected Value template with an interactive 3-scenario selector (Base, Stress, Upside), stipend coverage and IP retention rule, two-way Go/No-Go sensitivity matrix, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, tax, engineering, or investment advice.