# The Lean Project ROI Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/lean-project-roi/

1. **Lean_Project_ROI_Workbook.xlsx**: Complete 8-tab live Excel model reproducing every calculation of the Crestline Precision Manufacturing, Inc. case (Baseline P&L, Naive-to-Hard Bridge, all 5 projects, ASC 330 absorption drag, Pre-Tax and After-Tax 3-year NPV, 70 percent conservative stress test, and dynamic Controls tab = 0).
2. **Lean_Project_Savings_Calculator.xlsx**: Standalone practitioner calculator to classify Hard P&L, Cost Avoidance PV, Working Capital + Absorption Drag, and Soft Savings, and print a CFO-ready Gate 1 sign-off summary.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, tax, accounting, or external audit advice.