# The Interconnection Queue Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/interconnection-queue/

1. **Interconnection_Queue_Case_Workbook.xlsx**: Complete 8-tab Excel case model reproducing every calculation of the Alderbrook Grid Partners, LLC (Alderbrook Solar + Storage I, 150 MW AC) case: 645-day timeline, DFAX and per-capita allocations, restudy cascade, ATT mitigation, 24-month Cash vs. LC vs. Surety Bond carry costs, withdrawal penalties, 25-year IRR/NPV scenarios, Kill-Switch ceiling ($20,925,505 / $139.50/kW), IRC 48E QIP comparison, and dynamic Controls = 0.
2. **Interconnection_Cost_and_Timeline_Model.xlsx**: Standalone 6-tab practitioner template prefilled with an illustrative 150 MW project. Overwrite blue cells to model cluster allocations, deposit schedules, withdrawal penalties, Order 2003 reimbursement, and project IRR impact.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, engineering, tax, or investment advice.