# The Earned Value Management Handbook: companion files

Julian R. Sterling. Companion page: julianrsterling.com/earned-value-management

1. **EVM_Workbook.xlsx**: the model behind every figure of the Tamsfield Aerosystems, Inc. case, the fictional defense contractor followed through the book on the Corriden airborne sensor pod EMD contract (CPIF, 11 control accounts, 20 planned months, completed in Month 24). Tabs: README, Inputs, Baseline_Log, PMB_Time_Phased, Earned_Value, Actual_Cost, Program_Monthly, CA_Status_M12, Techniques, Subcontract, Earned_Schedule, EAC_Methods, Bottom_Up_EAC, TCPI, VAR_Thresholds, IBR, Schedule_Health, OTB_Test, Fee, Withholding, Pellwood and Checks. It rebuilds BCWS, BCWP and ACWP by work package and month from each work package's technique, budget, planned and actual months and cost efficiency, then the baseline log (CBB, MR, UB, PMB, TAB), the monthly program indices, the Month 12 control account status (CPI 0.89, SPI 0.77), the LOE distortion and tail, the Quillmont subcontract roll-up, earned schedule (ES 9.81 months, IEAC(t) 24.47 months), the five index EACs at Months 6, 12 and 18, the bottom-up and PM EACs ($124,644,552.90), TCPI, the variance tests, the IBR, schedule health, the OTB rules of thumb, fee, the withholding what-if and the Pellwood Clinic illustration. All inputs are blue cells; Tamsfield's own conventions (thresholds, CAM factors, risk adjustment, IMS counts) are inputs too, not DoD values. The Checks tab must read 0.
2. **Earned_Value_Calculator.xlsx**: a free calculator for one project. Enter the BAC, an optional management reserve, the planned duration and monthly PV, EV and AC (up to 36 months). It returns CV, SV, CPI and SPI (cumulative and current), CV and SV percent (common convention), the EAC by four methods with the VAC of each, TCPI to BAC and to the CPI EAC, earned schedule ES, SV(t), SPI(t) and IEAC(t), a flag when an EAC exceeds BAC plus MR, and a chart-ready table. It never produces a bottom-up EAC or a variance explanation. Prefilled with the illustrative Example Project: replace the blue cells with your data. The Checks tab must read 0. Also at julianrsterling.com/templates/earned-value-calculator/

Blue cells are inputs, black cells are formulas; no macros. Every company, person, budget, cost, date and count is fictional and invented for illustration. Education only, not legal, contracting or accounting advice: rules are described as read in November 2026.
