1. **Silver_Mesa_Lithium_Project_Finance_Workbook.xlsx**: Complete 8-tab Excel case model reproducing Silver Mesa Lithium (25,079 tpa LiOH.H2O, $7,367/t C1, $900,000,000 CapEx, $480,000,000 blended DOE/ECA senior debt @ 5.78 percent, $68,258,418 OBBBA-phased Section 45X cash, 1.43x Min DSCR, 2.17x LLCR, 2.92x PLCR, 19.1 percent Equity IRR, offtake floor stress, CapEx overrun stress, commercial counterfactual, and Nickel/Graphite/Rare Earth mini-cases), with dynamic Controls = 0.
2. **Critical_Minerals_Project_Finance_Model.xlsx**: Standalone 6-tab Critical Minerals Project Finance Model with a 3-scenario selector (Base, Price Collapse, Overrun + Delay), 3x3 price/rate DSCR sensitivity matrix, offtake floor & sovereign lift analysis, and Controls = 0.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not engineering, legal, tax, or investment advice.