# The CMMC Compliance Handbook: companion files

Julian R. Sterling. Companion page: julianrsterling.com/cmmc

1. **CMMC_Compliance_Workbook.xlsx**: the model behind every figure of the Marrowfield Precision Components, Inc. case, the fictional US machine shop (85 employees) followed through the book. Tabs: README, Requirements, Gap_2026, Mock, Self_Assessment, POAM, Closeout, Scope, Budget, Enclave_vs_Enterprise, DoD_Estimates, Calendar and Checks. It rebuilds the 110 requirements of NIST SP 800-171 Rev. 2 with their 32 CFR 170.24 point values (maximum 110, minimum -203) and POA&M rules, the January 12, 2026 gap assessment (score -35, 53 requirements NOT MET, 145 points lost, against the 104 posted in 2023), the May 15, 2026 mock assessment (89, above 88 but not eligible), the June 30, 2026 self-assessment (102, Conditional Level 2 (Self)) and its two what-ifs (99 and 101, not eligible), the six-item POA&M and its closeout on October 14, 2026 (110, Final Level 2 (Self), 106 days used out of 180, deadline December 27, 2026), the scope, the budget ($194,190 one-time, $71,292 a year, $408,066 over three years), the enclave against an enterprise-wide scope ($716,410, a saving of $308,344), the DoD estimates and the calendar. The Checks tab must read 0.
2. **SPRS_Score_Calculator.xlsx**: a standalone calculator for your own company. Set each of the 110 requirements to MET, NOT MET, PARTIAL or N/A; it returns the SPRS score, the points lost by family, whether Conditional status is available (88 points, the six requirements never allowed on a POA&M, the 3-point case of SC.L2-3.13.11), the findings that block it, the POA&M list with its 180-day closeout deadline and the affirmation dates, and a budget comparing a CUI enclave with an enterprise-wide scope, with the DoD estimates. Prefilled with Example Co., an illustrative company with invented statuses and amounts: type over the blue cells to enter your own. The Checks tab must read 0.
3. **CMMC_Checklists_and_Templates.docx**: the checklists and templates of Appendix B in editable Word form: FCI and CUI identification, scoping worksheet, SSP outline, POA&M fields, evidence binder index, MSP and cloud due diligence, flowdown, annual affirmation, incident reporting, self-assessment and SPRS entry, changes that call for a fresh look, a one-page board briefing and a scoping decision record.

Blue cells are inputs, black cells are formulas; no macros. Every company, person, score, date and amount is fictional and invented for illustration. The DoD figures are estimates from the regulatory impact analysis of the final rule (2023 dollars), not prices. A calculator adds up the statuses you enter: it does not replace the NIST SP 800-171A assessment objectives. Rules as read in November 2026. Not legal advice.
