# The Build-to-Suit Development Handbook: Companion Files

Julian R. Sterling. Companion page: https://julianrsterling.com/build-to-suit/

1. **Build_to_Suit_Case_Workbook.xlsx**: Complete 8-tab Excel case model reproducing every calculation of Redwood Logistics Center (Parcel 4B) (Sources & Uses, $35,233,058 TDC, 7.66% YoC, non-HVCRE check, 22-month equity-first S-curve draw schedule, 41.4% levered IRR, Crestline Life DSCR-constrained permanent refinance, Granitegate 10-year STNL buyer model, 11 U.S.C. 502(b)(6) cap, exit cap sensitivities, and dynamic Controls = 0).
2. **Build_to_Suit_Development_Model.xlsx**: Standalone 6-tab practitioner template (README, Inputs_Assumptions, Sources_Uses_YoC, Monthly_CashFlow, Sensitivities, Controls) prefilled with an illustrative industrial BTS. Overwrite blue inputs and flip the 3-case Scenario Selector (Base, +10% Hard Cost, +50 bps Exit Cap) to underwrite any live BTS project across a 22-month draw schedule and exit cap grid.

Blue cells are inputs, black cells are formulas, zero macros, unlocked. Education only, not legal, accounting, tax, engineering, or investment advice.
